Print Report | Back to Sample Detail

Sample Record for 2026-06-11-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1002200 DEA: 061G1904 EFIS: 0623000160 QA Service Level: 1
DIST-CO-RTE-PM: 06-KER-58,65,99,178-Var
Work Description: Furnish and place polyester concrete overlay
Location Description: Construction on State Highway in Kern County at various locations.
Contractor Name: J. Francis Company (Diana Hanna)
Contractor Address: Unknown
Resident Engineer: Amarjit Dhaliwal Structure Rep.: Vicente Sanchez

Sample Information

DIME Sample ID: 2026-06-11-1
TL Number from the TL Form:
Sample Submitted By Organization: CT D06 - Fresno Construction Field Office
Sample Organization Contact: (559) 243-3828
Type of Sample: Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 06/11/2026
Date that the sample was received by the laboratory/organization performing the testing: 06/11/2026
The quantity of what the sample constitutes: Multiple Lanes
A brief description of the sample: Skid Testing Request
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier: 50-0516
Structure name: MORNING DRIVE OC
The fabricator/manufacturer/facility name: J. FRANCIS CO.

Material Information

Pavement Surface Type: Methacrylate Resin
Type of Traffic Control Provided: Stationary Lane Closure
DIST-CO-RTE: 06-KER-178
Direction of Travel: North
Post Mile: 7.00
Lanes to be Tested: Lane #3
Station:

Test Results

Test

DIME Test ID: 2026-06-11-1-2
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 06/18/2026
Date Tested: 06/16/2026
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.45