Print Report | Back to Sample Detail

Sample Record for 2026-05-29-41

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 995520 DEA: 041Y7004 EFIS: 0423000016 QA Service Level: 1
DIST-CO-RTE-PM: 04-CC,SOL-80-13.8/14.1,0.0/0.4
Work Description: AL ZAMPA BRIDGE DECK REHABILITATION REPLACE TOP COURSE
Location Description: CONTRA COSTA AND SOLANO COUNTIES AT CROCKETT AND IN VALLEJO FROM UNION PACIFIC RAILROAD OVERHEAD TO 0.8 MILE SOUTH OF ROUTE 80/29 SEPARATION
Contractor Name: O.C. JONES & SONS, INC.
Contractor Address: 1520 fourth Street, Berkley, CA, 94710
Resident Engineer: Ferdinand Ciceron Structure Rep.: John Parecadan

Sample Information

DIME Sample ID: 2026-05-29-41
TL Number from the TL Form: 60326-1
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Quality Assurance
Type of Material: Asphalt Binder
Sample Taken Date: 05/29/2026
Date that the sample was received by the laboratory/organization performing the testing: 06/05/2026
The quantity of what the sample constitutes: 3 binder cans
A brief description of the sample: PG76-22M from PNW
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name: AL Zampa Bridge
The fabricator/manufacturer/facility name: pacifc northwest

Material Information

Performance Grade: PG 76-22 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier: Martin Murrieta Berkley Plant
Certified Asphalt Supplier: Pacific Northwest Oil - Stockton CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
HMA Type:
HMA Supplier Mix ID Number:

Test Results

Test

DIME Test ID: 2026-05-29-41-2
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 06/11/2026
Date Tested: 06/10/2026
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: MASS CHANGE
Test Result Compliance: does not comply
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Is mass change correction factor needed? Yes
Any material loss from containers during heating process/testing? No
Mass of container #1 before test (m1i) 203.199 grams
Mass of container #2 before test (m2i) 207.017 grams
Mass of container #1 after test (m1f) 202.413 grams
Mass of container #2 after test (m2f) 206.245 grams
Average mass change -2.217 percent
Mass of empty container #1 168.206 grams
Mass of empty container #2 171.93 grams
Mass correction factor 0.006

Test

DIME Test ID: 2026-05-29-41-3
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 06/11/2026
Date Tested: 06/10/2026
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: OG
Test Result Compliance: does not comply
Additional Comments When Verified:
Phase Original binder
Test Gap 1 mm
Test Frequency 10.0 rad/s
Strain Amplitude 12.06 %
Stress Amplitude 0.066 kPa
Phase Angle (δ) (for the 10 cycles) 70.5 degree
Complex Modulus (G*) (for the 10 measurements) 0.546 kPa
Test Temperature (Specimen 1) 76.0 C
Dynamic Shear, G*/sin(δ) 0.58 kPa

Test

DIME Test ID: 2026-05-29-41-4
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 06/11/2026
Date Tested: 06/10/2026
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: RTFO
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Test Gap 1 mm
Test Frequency 10.0 rad/s
Strain Amplitude 10.05 %
Stress Amplitude 0.196 kPa
Phase Angle (δ) (for the 10 cycles) 62.1 degree
Complex Modulus (G*) (for the 10 measurements) 1.948 kPa
Test Temperature (Specimen 1) 76.0 C
Dynamic Shear, G*/sin(δ) 2.20 kPa

Test

DIME Test ID: 2026-05-29-41-5
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 06/16/2026
Date Tested: 06/15/2026
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: PAV
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Test Gap 2 mm
Test Frequency 10.0 rad/s
Strain Amplitude 1.01 %
Stress Amplitude 11.306 kPa
Phase Angle (δ) (for the 10 cycles) 49.6 degree
Complex Modulus (G*) (for the 10 measurements) 1124.898 kPa
Test Temperature (Specimen 1) 31.0 C
(G*) x sin(δ)= 857 kPa

Test

DIME Test ID: 2026-05-29-41-6
Test Method: AASHTO T313-2025: Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 06/16/2026
Date Tested: 06/15/2026
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: BBR
Test Result Compliance: complies
Additional Comments When Verified:
Maximum test bath temperature at 240 S -12.0 C
Minimum test bath temperature at 240 S -12.0 C
Estimated Stiffness Modulus 8.0 s 0.000 MPa
Estimated m-value 8.0 s 0.000
Estimated Stiffness Modulus 15.0 s 0.000 MPa
Estimated m-value 15.0 s 0.000
Estimated Stiffness Modulus 30.0 s 0.000 MPa
Estimated m-value 30.0 s 0.000
Estimated Stiffness Modulus 60.0 s 93.168 MPa
Estimated m-value 60.0 s 0.359
Estimated Stiffness Modulus 120.0 s 0.000 MPa
Estimated m-value 120.0 s 0.000
Estimated Stiffness Modulus 240.0 s 0.000 MPa
Estimated m-value 240.0 s 0.000

Test

DIME Test ID: 2026-05-29-41-7
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 06/17/2026
Date Tested: 06/17/2026
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: ELASTIC RECOVERY
Test Result Compliance: complies
Additional Comments When Verified:
Final Reading from the testing machine (X) 3.0 cm
% Elongation Recovery 85 %