Print Report | Back to Sample Detail

Sample Record for 2026-04-28-62

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000903 DEA: 081M0404 EFIS: 0821000091 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-40-R140.0/R142.2
Work Description: COLD PLANE AC & RHMA, VEGETATION CONTROL (MINOR CONC), MGS, AND HTCB.
Location Description: SAN BERNARDINO COUNTY IN NEEDLES FROM FOX WASH OVERFLOW TO L STREET UNDERCROSSING
Contractor Name: INTERSTATE CIVIL CONSTRUCTION
Contractor Address: Unknown
Resident Engineer: Anthony Doan Structure Rep.: Jegbefume Adodo

Sample Information

DIME Sample ID: 2026-04-28-62
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 04/28/2026
Date that the sample was received by the laboratory/organization performing the testing: 05/29/2026
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite-Desert -INDIO

Material Information

Performance Grade: PG 70-10
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test

DIME Test ID: 2026-04-28-62-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/08/2026
Date Tested: 06/02/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 88.9 degree
Dynamic Shear, G*/sin(δ) 2.65 kPa

Test

DIME Test ID: 2026-04-28-62-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/08/2026
Date Tested: 06/02/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 89.5 degree
Dynamic Shear, G*/sin(δ) 1.50 kPa

Test

DIME Test ID: 2026-04-28-62-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 07/08/2026
Date Tested: 06/26/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested Two
Ductility of test #1 (D1) 30 cm
Ductility of test #2 (D2) 150 cm
Ductility of sample 90 cm

Test

DIME Test ID: 2026-04-28-62-4
Test Method: AASHTO T313-2025: Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 07/08/2026
Date Tested: 07/07/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Maximum test bath temperature at 240 S 0.0 C
Minimum test bath temperature at 240 S 0.0 C
Estimated Stiffness Modulus 8.0 s 0.000 MPa
Estimated m-value 8.0 s 0.000
Estimated Stiffness Modulus 15.0 s 0.000 MPa
Estimated m-value 15.0 s 0.000
Estimated Stiffness Modulus 30.0 s 0.000 MPa
Estimated m-value 30.0 s 0.000
Estimated Stiffness Modulus 60.0 s 249.005 MPa
Estimated m-value 60.0 s 0.358
Estimated Stiffness Modulus 120.0 s 0.000 MPa
Estimated m-value 120.0 s 0.000
Estimated Stiffness Modulus 240.0 s 0.000 MPa
Estimated m-value 240.0 s 0.000

Test

DIME Test ID: 2026-04-28-62-5
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/08/2026
Date Tested: 07/07/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 65.2 degree
(G*) x sin(δ)= 2543 kPa