Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1001468 DEA: 081L2404 EFIS: 0819000167
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-95-R57.2/64.5
Work Description: RHMA (GAP GRADED), REPLACE AC SURFACING, AND COLD PLANE AC PVMT.
Location Description: SAN BERNARDINO COUNTY NEAR NEEDLES FROM ROUTE 40/95 SEPARATION TO 0.5 MILE NORTH OF GOFFS ROAD
Contractor Name: SULLY - MILLER CONTRACTING COMPANY
Contractor Address: 135 S STATE COLLEGE BLVD. 400, BREA, CA 92821
Resident Engineer: Anthony Doan Structure Rep.: Unknown
DIME Sample ID: 2026-04-02-112
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 04/02/2026
Date that the sample was received by the laboratory/organization performing the testing: 04/09/2026
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Blue Diamond-Victorville
Performance Grade: PG 64-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Lunday Thagard Company-World Oil - South Gate CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
HMA Type:
HMA Supplier Mix ID Number:
DIME Test ID: 2026-04-02-112-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/03/2026
Date Tested: 05/12/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
RTFO residue
|
|
Phase Angle (δ) (for the 10 cycles)
|
83.0 degree
|
|
Dynamic Shear, G*/sin(δ)
|
4.38 kPa
|
DIME Test ID: 2026-04-02-112-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/03/2026
Date Tested: 05/12/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
Original binder
|
|
Phase Angle (δ) (for the 10 cycles)
|
86.8 degree
|
|
Dynamic Shear, G*/sin(δ)
|
1.49 kPa
|
DIME Test ID: 2026-04-02-112-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 07/03/2026
Date Tested: 05/14/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is a normal test obtainable?
|
Yes
|
|
Number of replicates tested
|
One
|
|
Ductility of test #1 (D1)
|
148 cm
|
|
Ductility of sample
|
148 cm
|
DIME Test ID: 2026-04-02-112-4
Test Method: AASHTO T313-2025: Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 07/03/2026
Date Tested: 06/18/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Maximum test bath temperature at 240 S
|
0.0 C
|
|
Minimum test bath temperature at 240 S
|
0.0 C
|
|
Estimated Stiffness Modulus 8.0 s
|
0.000 MPa
|
|
Estimated m-value 8.0 s
|
0.000
|
|
Estimated Stiffness Modulus 15.0 s
|
0.000 MPa
|
|
Estimated m-value 15.0 s
|
0.000
|
|
Estimated Stiffness Modulus 30.0 s
|
0.000 MPa
|
|
Estimated m-value 30.0 s
|
0.000
|
|
Estimated Stiffness Modulus 60.0 s
|
101.012 MPa
|
|
Estimated m-value 60.0 s
|
0.312
|
|
Estimated Stiffness Modulus 120.0 s
|
0.000 MPa
|
|
Estimated m-value 120.0 s
|
0.000
|
|
Estimated Stiffness Modulus 240.0 s
|
0.000 MPa
|
|
Estimated m-value 240.0 s
|
0.000
|
DIME Test ID: 2026-04-02-112-5
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/03/2026
Date Tested: 06/18/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
PAV residue
|
|
Test Plate Diameter
|
8 mm
|
|
Phase Angle (δ) (for the 10 cycles)
|
43.2 degree
|
|
(G*) x sin(δ)=
|
3627 kPa
|