Print Report | Back to Sample Detail

Sample Record for 2026-04-18-29

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000607 DEA: 081K6904 EFIS: 0819000090 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-74-5.7/11.8
Work Description: ROCK EXCAVATION, HMA (TYPE A), RHMA-G, AND CABLE NET DRAPERY SYSTEM.
Location Description: RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: Unknown
Resident Engineer: Fereydoon Alipanah Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2026-04-18-29
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 04/18/2026
Date that the sample was received by the laboratory/organization performing the testing: 04/21/2026
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Martin Marietta Lake Elsinore

Material Information

Performance Grade: PG 58-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Valero Wilmington Refinery - Wilmington CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
HMA Type:
HMA Supplier Mix ID Number:

Test Results

Test

DIME Test ID: 2026-04-18-29-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/12/2026
Date Tested: 05/07/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 80.1 degree
Dynamic Shear, G*/sin(δ) 4.42 kPa

Test

DIME Test ID: 2026-04-18-29-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/12/2026
Date Tested: 05/07/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 85.3 degree
Dynamic Shear, G*/sin(δ) 1.56 kPa

Test

DIME Test ID: 2026-04-18-29-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 07/14/2026
Date Tested: 05/14/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested One
Ductility of test #1 (D1) 75 cm
Ductility of sample 75 cm

Test

DIME Test ID: 2026-04-18-29-4
Test Method: AASHTO T313-2025: Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 07/14/2026
Date Tested: 07/09/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Maximum test bath temperature at 240 S 0.0 C
Minimum test bath temperature at 240 S 0.0 C
Estimated Stiffness Modulus 8.0 s 0.000 MPa
Estimated m-value 8.0 s 0.000
Estimated Stiffness Modulus 15.0 s 0.000 MPa
Estimated m-value 15.0 s 0.000
Estimated Stiffness Modulus 30.0 s 0.000 MPa
Estimated m-value 30.0 s 0.000
Estimated Stiffness Modulus 60.0 s 52.679 MPa
Estimated m-value 60.0 s 0.385
Estimated Stiffness Modulus 120.0 s 0.000 MPa
Estimated m-value 120.0 s 0.000
Estimated Stiffness Modulus 240.0 s 0.000 MPa
Estimated m-value 240.0 s 0.000

Test

DIME Test ID: 2026-04-18-29-5
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/14/2026
Date Tested: 07/09/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 46.6 degree
(G*) x sin(δ)= 2394 kPa