Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1000541 DEA: 09374704 EFIS: 0918000019
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-168,395-17.6/18.3,114.9/117.8
Work Description: HMA (TYPE A), MINOR CONCRETE, AND LIGHTING.
Location Description: INYO COUNTY IN AND NEAR BISHOP ON ROUTE 395 FROM 0.1 MILE SOUTH OF JAY STREET TO BARLOW LANE AND ON ROUTE 168 FROM PIONEER LANE TO ROUTE 395
Contractor Name: PAPICH CONSTRUCTION COMPANY, INC.
Contractor Address: P.O. BOX 2210, PISMO BEACH, CA 93448-2210
Resident Engineer: Matthew Gonzalez Structure Rep.: Unknown
DIME Sample ID: 2025-11-03-99
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 11/03/2025
Date that the sample was received by the laboratory/organization performing the testing: 12/01/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HOT PLANT
Performance Grade: PG 70-10
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
HMA Type:
HMA Supplier Mix ID Number:
DIME Test ID: 2025-11-03-99-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 03/17/2026
Date Tested: 03/11/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
RTFO residue
|
|
Phase Angle (δ) (for the 10 cycles)
|
88.8 degree
|
|
Dynamic Shear, G*/sin(δ)
|
2.69 kPa
|
DIME Test ID: 2025-11-03-99-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 03/17/2026
Date Tested: 03/11/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
Original binder
|
|
Phase Angle (δ) (for the 10 cycles)
|
89.4 degree
|
|
Dynamic Shear, G*/sin(δ)
|
1.46 kPa
|
DIME Test ID: 2025-11-03-99-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 03/17/2026
Date Tested: 03/13/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is a normal test obtainable?
|
Yes
|
|
Number of replicates tested
|
One
|
|
Ductility of test #1 (D1)
|
75 cm
|
|
Ductility of sample
|
75 cm
|
DIME Test ID: 2025-11-03-99-4
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 03/17/2026
Date Tested: 03/13/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is a normal test obtainable?
|
Yes
|
|
Number of replicates tested
|
One
|
|
Ductility of test #1 (D1)
|
75 cm
|
|
Ductility of sample
|
75 cm
|
DIME Test ID: 2025-11-03-99-5
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 06/17/2026
Date Tested: 06/16/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Time test started
|
no data HH:MM:SS
|
|
Flags issued by software during test
|
no data
|
|
Correlation coefficient (R²)
|
no data
|
|
Regression coefficient a
|
no data
|
|
Regression coefficient b
|
no data
|
|
Regression coefficient c
|
no data
|
|
Load at time 0.0
|
no data
|
|
Deflection at time 0.0 s
|
no data
|
|
Load at time 0.5 s
|
no data
|
|
Deflection at time 0.5 s
|
no data
|
|
Load at 60.0 s
|
no data
|
|
Beam deflection 60.0 s
|
no data
|
|
Measured Stiffness Modulus 60.0 s
|
no data
|
|
Estimated Stiffness Modulus 60.0 s
|
49.636 MPa
|
|
Difference between stiffness moduli 60.0 s
|
no data
|
|
Estimated m-value 60.0 s
|
0.424
|
DIME Test ID: 2025-11-03-99-6
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 07/03/2026
Date Tested: 06/16/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
PAV residue
|
|
Test Plate Diameter
|
8 mm
|
|
Phase Angle (δ) (for the 10 cycles)
|
53.0 degree
|
|
(G*) x sin(δ)=
|
1714 kPa
|