Print Report | Back to Sample Detail

Sample Record for 2025-09-09-132

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 995060 DEA: 081J2604 EFIS: 0818000012 COOP: NONE QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-215-R13.5/R19.5
Work Description: RHMA, REPLACE AC SURFACING, ROCK BLANKET, AND COMPOST.
Location Description: RIVERSIDE COUNTY IN MURRIETA AND MENIFEE FROM 1.0 MILE NORTH OF CLINTON KEITH ROAD TO 1.0 MILE NORTH OF NEWPORT ROAD
Contractor Name: MARTIN MARIETTA SAN DIEGO AGGREGATES LLC DBA ATP GENERAL ENGINEERING CONTRACTORS
Contractor Address: 4211 Ponderosa Avenue, Suite C, San Diego, CA 92123
Resident Engineer: Osama Abdalla Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2025-09-09-132
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 09/09/2025
Date that the sample was received by the laboratory/organization performing the testing: 09/17/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RJ Noble-Corona

Material Information

Performance Grade: PG 64-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
HMA Type:
HMA Supplier Mix ID Number:

Test Results

Test

DIME Test ID: 2025-09-09-132-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 03/17/2026
Date Tested: 03/04/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 86.9 degree
Dynamic Shear, G*/sin(δ) 1.55 kPa

Test

DIME Test ID: 2025-09-09-132-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
This test has been superseded on 05/20/2026. The corrected test ID is: 2025-09-09-132-6
Reason: retested

Test

DIME Test ID: 2025-09-09-132-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 03/17/2026
Date Tested: 03/13/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested One
Ductility of test #1 (D1) 75 cm
Ductility of sample 75 cm

Test

DIME Test ID: 2025-09-09-132-4
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 05/20/2026
Date Tested: 05/18/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Time test started no data HH:MM:SS
Flags issued by software during test no data
Correlation coefficient (R²) no data
Regression coefficient a no data
Regression coefficient b no data
Regression coefficient c no data
Load at time 0.0 no data
Deflection at time 0.0 s no data
Load at time 0.5 s no data
Deflection at time 0.5 s no data
Load at 60.0 s no data
Beam deflection 60.0 s no data
Measured Stiffness Modulus 60.0 s no data
Estimated Stiffness Modulus 60.0 s 85.582 MPa
Difference between stiffness moduli 60.0 s no data
Estimated m-value 60.0 s 0.349

Test

DIME Test ID: 2025-09-09-132-5
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/20/2026
Date Tested: 05/18/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 46.4 degree
(G*) x sin(δ)= 2624 kPa

Test

DIME Test ID: 2025-09-09-132-6
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/20/2026
Date Tested: 03/04/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
The test was superseded from test ID: 2025-09-09-132-2
Test Result Compliance: does not comply
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 86.4 degree
Dynamic Shear, G*/sin(δ) 2.90 kPa