Print Report | Back to Sample Detail

Sample Record for 2026-02-13-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000403 DEA: 120K91U4 EFIS: 1222000031 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-91-R9.2/R11.4
Work Description: CONST BRIDGES, RW, SW, PAVEMENT, DRAINAGE AND ELECTRICAL SYSTEMS.
Location Description: ORANGE COUNTY IN ANAHEIM FROM 0.9 MILE WEST TO 1.3 MILES EAST OF LAKEVIEW AVENUE OVERCROSSING
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 16700 Valley View Avenue Suite 300
Resident Engineer: Steve Kinaly Structure Rep.: Wei-Jen Lee

Sample Information

DIME Sample ID: 2026-02-13-5
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Vallejo Field Laboratory
Sample Organization Contact: 9166394315
Type of Sample: Quality Assurance
Type of Material: Precast Concrete
Sample Taken Date: 02/13/2026
Date that the sample was received by the laboratory/organization performing the testing: 02/17/2026
The quantity of what the sample constitutes: 32.9 Cubic Yards
A brief description of the sample: set of three 4x8 cylinders
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Con-Fab California, LLC - Shafter

Material Information

The concrete mix design number: SCC-S9.8-FG
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 6920
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Concrete sample from wheelbarrow of 4th load of concrete
Where the material sample would have been placed if not sampled: Girder Mark L2.9
From Lot No.:
Bag Lot No.:

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2026-02-13-5-1ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens02/18/202603/13/2026Mario Periera VazCT D06 - Bakersfield Field LaboratoryMin F'c @ 28day is 10 Kips