Print Report | Back to Sample Detail

Sample Record for 2025-09-15-115

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 995493 DEA: 081G6704 EFIS: 0816000049 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-79-5.4/11.4
Work Description: HOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC.
Location Description: RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD
Contractor Name: ORTIZ ENTERPRISES, INC.
Contractor Address: 6 CUSHING STE 200, IRVINE, CA 92618
Resident Engineer: Osama Abdalla Structure Rep.: Arnel Vega

Sample Information

DIME Sample ID: 2025-09-15-115
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 09/15/2025
Date that the sample was received by the laboratory/organization performing the testing: 09/18/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: R J Noble - Corona

Material Information

Performance Grade: PG 64-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Lunday Thagard Company-World Oil - South Gate CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 5

DIME Test ID: 2025-09-15-115-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 01/21/2026
Date Tested: 01/07/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 87.2 degree
Dynamic Shear, G*/sin(δ) 1.41 kPa

Test 2 of 5

DIME Test ID: 2025-09-15-115-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 01/21/2026
Date Tested: 01/07/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 84.2 degree
Dynamic Shear, G*/sin(δ) 4.03 kPa

Test 3 of 5

DIME Test ID: 2025-09-15-115-3
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 02/03/2026
Date Tested: 01/31/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Time test started no data HH:MM:SS
Flags issued by software during test no data
Correlation coefficient (R²) no data0
Regression coefficient a no data
Regression coefficient b no data
Regression coefficient c no data
Load at time 0.0 no data0 mN
Deflection at time 0.0 s no data0 µm
Load at time 0.5 s no data0 mN
Deflection at time 0.5 s no data0 µm
Load at 60.0 s no data0 mN
Beam deflection 60.0 s no data0 µm
Measured Stiffness Modulus 60.0 s no data
Estimated Stiffness Modulus 60.0 s 115.223 MPa
Difference between stiffness moduli 60.0 s no data
Estimated m-value 60.0 s 0.322

Test 4 of 5

DIME Test ID: 2025-09-15-115-4
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 02/03/2026
Date Tested: 01/31/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 43.7 degree
(G*) x sin(δ)= 4248 kPa

Test 5 of 5

DIME Test ID: 2025-09-15-115-5
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 02/03/2026
Date Tested: 01/23/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested One
Ductility of test #1 (D1) 75 cm
Ductility of sample 75 cm