Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 993798 DEA: 09366804 EFIS: 0916000021
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-117.3/117.9
Work Description: MEADOW FARMS ADA
Location Description: INYO COUNTY NEAR BISHOP FROM 0.1 MILE EAST OF SEE VEE LANE TO BARLOW LANE
Contractor Name: PAPICH CONSTRUCTION COMPANY, INC.
Contractor Address: P.O. BOX 2210, PISMO BEACH, CA 93448-2210
Resident Engineer: Adam Zumstein Structure Rep.: Mulugheta Belay
DIME Sample ID: 2025-11-05-98
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 11/05/2025
Date that the sample was received by the laboratory/organization performing the testing: 12/01/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HOT PLANT
Performance Grade: PG 70-10
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2025-11-05-98-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 01/21/2026
Date Tested: 12/09/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
RTFO residue
|
|
Phase Angle (δ) (for the 10 cycles)
|
88.9 degree
|
|
Dynamic Shear, G*/sin(δ)
|
2.58 kPa
|
DIME Test ID: 2025-11-05-98-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 01/21/2026
Date Tested: 12/09/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
Original binder
|
|
Phase Angle (δ) (for the 10 cycles)
|
87.6 degree
|
|
Dynamic Shear, G*/sin(δ)
|
1.46 kPa
|
DIME Test ID: 2025-11-05-98-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 01/21/2026
Date Tested: 12/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is a normal test obtainable?
|
Yes
|
|
Number of replicates tested
|
One
|
|
Ductility of test #1 (D1)
|
75 cm
|
|
Ductility of sample
|
75 cm
|