Print Report | Back to Sample Detail

Sample Record for 2025-11-25-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000081 DEA: 081J5404 EFIS: 0818000069 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-15-2.4
Work Description: CB, JPCP (RSC), STRUCTURAL CONCRETE AND MODIFYING LIGHTING SYSTEMS.
Location Description: SAN BERNARDINO COUNTY IN ONTARIO AT ROUTE 10/15 SEPARATION
Contractor Name: FLATIRON WEST, INC.
Contractor Address: 12121 Scripps Summit Drive, Suite 400, San Diego, CA 92131
Resident Engineer: Giang-Sinh Tran Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2025-11-25-1
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM7 - Epoxy Coated Dowels
Sample Taken Date: 11/25/2025
Date that the sample was received by the laboratory/organization performing the testing: 12/02/2025
The quantity of what the sample constitutes: 1620 LF
A brief description of the sample: 1.5"X 30"
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Pacific Highway Products

Material Information

Dowel Metal Heat Number: 4400038064
Dowel Epoxy Batch Number: CH1255YE
Dowel Coating Specification: ASTM A775
Dowel Size: 1.5 in
Dowel Coating Color: Green
Dowel Manufacturer:
Dowel Coater: Simcote
Release Number:
Quality Assurance Code:
Rebar Size (#):

Test Results

Test

DIME Test ID: 2025-11-25-1-1
Test Method: ASTM A884-19e20: Standard Specification for Epoxy-Coated Steel Wire and Welded Wire Reinforcement (Epoxy Coating Thickness)
Verified Date: 12/09/2025
Date Tested: 12/09/2025
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: brian.ellis@dot.ca.gov
Organization Phone: (916) 380-8623
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
First Bar Mean 9.32
Second Bar Mean 12.35
Lower spec. limit LSL 7 mils
Upper spec. limit USL 40 mils
Total mean value 10.83
Total number of values less than LSL no data
Total number of values greater than USL no data

Test

DIME Test ID: 2025-11-25-1-2
Test Method: ASTM A884-19e20: Standard Specification for Epoxy-Coated Steel Wire and Welded Wire Reinforcement (Holiday)
Verified Date: 12/09/2025
Date Tested: 12/09/2025
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: brian.ellis@dot.ca.gov
Organization Phone: (916) 380-8623
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Total Number of Holiday no data0
Total Length 3
Holidays Per Linear Foot of Bar no data0 holiday per ft
Holiday Test Pass/Fail Pass