|
Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 65A0617 Cty Rte PM Vendor # |
|
REPORT OF LABORATORY TESTING |
||||
|
Resident Engineer: |
Unknown |
Date Reported: |
11/13/2017 |
|
|
Address: |
TL Number: |
152764 |
||
|
City: |
||||
|
Project Name: Type 15 FBS , ST-75 Bridge Rail, Type 85 Concrete Bridge Rail |
||||
|
Prime Contractor: Not set |
||||
|
Sample Taken Date: |
10/30/2017 |
Mix Design: |
z5605210 |
|
|
Contractor: Unknown |
Location : |
|||
|
Structure unique identifier: Unknown |
||||
|
Structure name: Unknown |
||||
|
Location of Pour: Unknown |
||||
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
| Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
|---|---|---|---|---|---|
| 1 | 6.02 | 28.46 | 124170 | 4363.0 | 1 |
| 2 | 6.00 | 28.27 | 132661 | 4692.6 | 1 |
DIME Test ID: 2017-10-30-4-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4530
Age of specimen: 14 days
Certified By: Mike Mullins
|
*Subject to final inspection by the Resident Engineer. |
|
TL- Report of Laboratory Testing