Print Report | Back to Sample Detail

Sample Record for 2025-10-01-65

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993678 DEA: 042Q8004 EFIS: 0419000050 COOP: 042836,042944 QA Service Level: 1
DIST-CO-RTE-PM: 04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4
Work Description: US 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA.
Location Description:
Contractor Name: GORDON N. BALL, INC.
Contractor Address: 333 CAMILLE AVENUE, ALAMO, CA 94507
Resident Engineer: Mohamed Fouad Structure Rep.: Bryan Nagid

Sample Information

DIME Sample ID: 2025-10-01-65
TL Number from the TL Form:
Sample Submitted By Organization: CT SC - 3674 - Pacifica 2
Sample Organization Contact: (510) 714-7639
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 10/01/2025
Date that the sample was received by the laboratory/organization performing the testing: 10/20/2025
The quantity of what the sample constitutes: 176 CY
A brief description of the sample: Bent 17 CIDH Concrete
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier: 35-0252L
Structure name:
The fabricator/manufacturer/facility name: Central Concrete

Material Information

The concrete mix design number: DDGPV2Q3
The truck number from where the sample was collected: 3
The batch plant ticket number from where the sample was collected: 915804
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Concrete sample from wheel barrow
Where the material sample would have been placed if not sampled: CIDH Pile
From Lot No.:
Bag Lot No.:

Test Results

Test

DIME Test ID: 2025-10-01-65-1
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 10/29/2025
Date Tested: 10/29/2025
Submitted By Organization: Kleinfelder - Hayward
Organization Address: 690 Walnut,
Organization City: vallejo
Organization State: CA
Organization Zipcode: 94592
Organization Email: yannick.aranas@dot.ca.gov
Organization Phone: (916) 639-4315
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 3
Test performed With no density determined
Capped in accordance with? ASTM C1231 - Unbonded Elastomeric Pad Cap
Average diameter of cylinder 1 4.00 in
Average diameter of cylinder 2 4.00 in
Average diameter of cylinder 3 4.00 in
Cross sectional area of cylinder 1 12.57 in^2
Cross sectional area of cylinder 2 12.57 in^2
Cross sectional area of cylinder 3 12.57 in^2
Compressive strength (to nearest 10 psi) 7410 psi
Maximum load on cylinder 1 89980 lb
Maximum load on cylinder 2 93690 lb
Maximum load on cylinder 3 95623 lb
Compressive strength of cylinder 1 7158.3 psi
Type of fracture pattern of cylinder 1 5
Compressive strength of cylinder 2 7453.5 psi
Compressive strength of cylinder 3 7607.2 psi
Type of fracture pattern of cylinder 2 5
Type of fracture pattern of cylinder 3 5
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Correction factor for cylinder 3 1
Age of specimen 28 days
Age of specimen in hours no data0 hours