Print Report | Back to Sample Detail

Sample Record for 2025-09-25-55

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000665 DEA: 081K4004 EFIS: 0819000031 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-15-3.5/6.8
Work Description: HMA (TYPE A), RDWY EXC, STR CONC RET WALL, RUBBERIZED HMA (OGFC).
Location Description: TEMECULA FROM 0.1 MI NORTH OF TEMECULA PARKWAY TO 0.2 MI NORTH OF WINCHESTER ROAD
Contractor Name: BEADOR CONSTRUCTION COMPANY, INC.
Contractor Address: 2900 Bristol Street, Suite D204, Costa Mesa, CA 92626
Resident Engineer: Denise Sostrom Structure Rep.: Gizachew Abayneh

Sample Information

DIME Sample ID: 2025-09-25-55
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 09/25/2025
Date that the sample was received by the laboratory/organization performing the testing: 09/30/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RJ Noble-Corona

Material Information

Performance Grade: PG 58-22
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Lunday Thagard Company-World Oil - South Gate CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 9

DIME Test ID: 2025-09-25-55-4
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 11/26/2025
Date Tested: 10/01/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 85.2 degree
Dynamic Shear, G*/sin(δ) 3.66 kPa

Test 2 of 9

DIME Test ID: 2025-09-25-55-3
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 11/26/2025
Date Tested: 10/01/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 78.7 degree
Dynamic Shear, G*/sin(δ) 12.03 kPa

Test 3 of 9

DIME Test ID: 2025-09-25-55-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 11/26/2025
Date Tested: 10/01/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Specific Gravity 1.013

Test 4 of 9

DIME Test ID: 2025-09-25-55-5
Test Method: AASHTO T316-22: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 11/26/2025
Date Tested: 10/01/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s? Pa-s
Time of test 9:06 HH:MM
Test Temperature 135 C
Speed 100 rpm
Spindle size 21 in
Torque 88.6 %
Viscosity reading #1 (A) 0.437 Pa-s
Viscosity reading #2 (B) 0.442 Pa-s
Viscosity reading #3 (C) 0.45 Pa-s
Average viscosity 0.443 Pa-s

Test 5 of 9

DIME Test ID: 2025-09-25-55-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 11/26/2025
Date Tested: 10/01/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? NA
Soluble, percent 99.6 %
Insoluble, percent 0.4 %

Test 6 of 9

DIME Test ID: 2025-09-25-55-2
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 11/26/2025
Date Tested: 10/01/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Is mass change correction factor needed? Yes
Any material loss from containers during heating process/testing? No
Mass of container #1 before test (m1i) 207.721 grams
Mass of container #2 before test (m2i) 207.711 grams
Mass of container #1 after test (m1f) 207.703 grams
Mass of container #2 after test (m2f) 207.69 grams
Average mass change -0.05 percent
Mass of empty container #1 172.533 grams
Mass of empty container #2 172.802 grams
Mass correction factor 0.006

Test 7 of 9

DIME Test ID: 2025-09-25-55-7
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 11/26/2025
Date Tested: 10/03/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested One
Ductility of test #1 (D1) 16 cm
Ductility of sample 16 cm

Test 8 of 9

DIME Test ID: 2025-09-25-55-9
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 11/26/2025
Date Tested: 11/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 39.1 degree
(G*) x sin(δ)= 5654 kPa

Test 9 of 9

DIME Test ID: 2025-09-25-55-8
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 11/26/2025
Date Tested: 11/26/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Time test started no data HH:MM:SS
Flags issued by software during test no data
Correlation coefficient (R²) no data0
Regression coefficient a no data
Regression coefficient b no data
Regression coefficient c no data
Load at time 0.0 no data0 mN
Deflection at time 0.0 s no data0 µm
Load at time 0.5 s no data0 mN
Deflection at time 0.5 s no data0 µm
Load at 60.0 s no data0 mN
Beam deflection 60.0 s no data0 µm
Measured Stiffness Modulus 60.0 s no data
Estimated Stiffness Modulus 60.0 s 160.451 MPa
Difference between stiffness moduli 60.0 s no data
Estimated m-value 60.0 s 0.275