Print Report | Back to Sample Detail

Sample Record for 2025-09-21-10

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1001312 DEA: 11432844 EFIS: 1125000219 QA Service Level: 1
DIST-CO-RTE-PM: 11---
Work Description:
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Carlos Lopez Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2025-09-21-10
TL Number from the TL Form:
Sample Submitted By Organization: CT D11 - District 11 Materials Laboratory
Sample Organization Contact: (858) 518-8709
Type of Sample: Per Request
Type of Material: Aggregate
Sample Taken Date: 09/21/2025
Date that the sample was received by the laboratory/organization performing the testing: 09/23/2025
The quantity of what the sample constitutes: 1 Bag
A brief description of the sample: Plant Sample
From where was the sample collected: Supplier
Laboratory sample identification: 25-09-21-10-A
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan Otay

Material Information

Source Identification (SMARA, name of Pit or Job Site): Not Provided
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Plant
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 3/4 inch
The concrete mix design number:
Lot number:
Sublot number:
Aggregate Mix Number: 224114 Otay SJR

Test Results

Test 1 of 3

DIME Test ID: 2025-09-21-10-1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 10/16/2025
Date Tested: 10/16/2025
Submitted By Organization: CT D11 - District 11 Materials Laboratory
Organization Address: 4050 Taylor Street,
Organization City: San Diego
Organization State: CA
Organization Zipcode: 92110
Organization Email: benjamin.haney@dot.ca.gov
Organization Phone: (858) 688-1595
General Comments for this Test: Does Not Comply
Test Result Compliance: does not comply
Additional Comments When Verified:
What type of gradation is being tested? Combined Gradation
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 98 %
Cumulative percent passing the 1/2 in. sieve 80 %
Cumulative percent passing the 3/8 in. sieve 69 %
Cumulative percent passing the #4 sieve 45 %
Cumulative percent passing the #8 sieve 37 %
Cumulative percent passing the #16 sieve 28 %
Cumulative percent passing the #30 sieve 19 %
Cumulative percent passing the #50 sieve 11 %
Cumulative percent passing the #100 sieve 5 %
Cumulative percent passing the #200 sieve 3.6 %

Test 2 of 3

DIME Test ID: 2025-09-21-10-2
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Verified Date: 10/16/2025
Date Tested: 10/02/2025
Submitted By Organization: CT D11 - District 11 Materials Laboratory
Organization Address: 4050 Taylor Street,
Organization City: San Diego
Organization State: CA
Organization Zipcode: 92110
Organization Email: benjamin.haney@dot.ca.gov
Organization Phone: (858) 688-1595
General Comments for this Test: Complies
Test Result Compliance: complies
Additional Comments When Verified:
Sand Equivalent 67

Test 3 of 3

DIME Test ID: 2025-09-21-10-3
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 10/16/2025
Date Tested: 10/16/2025
Submitted By Organization: CT D11 - District 11 Materials Laboratory
Organization Address: 4050 Taylor Street,
Organization City: San Diego
Organization State: CA
Organization Zipcode: 92110
Organization Email: benjamin.haney@dot.ca.gov
Organization Phone: (858) 688-1595
General Comments for this Test: Does Not Comply
Test Result Compliance: does not comply
Additional Comments When Verified:
Is an aggregate correction factor used? Yes
Aggregate correction factor for the 2 in. sieve (% passing) no data0 %
Aggregate correction factor for the 1 1/2 in. sieve (% passing) no data0 %
Aggregate correction factor for the 1 in. sieve (% passing) no data0 %
Aggregate correction factor for the 3/4 in. sieve (% passing) no data0 %
Aggregate correction factor for the 1/2 in. sieve (% passing) no data0 %
Aggregate correction factor for the 3/8 in. sieve (% passing) -0.4 %
Aggregate correction factor for the #4 sieve (% passing) -2.4 %
Aggregate correction factor for the #8 sieve (% passing) -1 %
Aggregate correction factor for the #16 sieve (% passing) -1.7 %
Aggregate correction factor for the #30 sieve (% passing) -2.3 %
Aggregate correction factor for the #50 sieve (% passing) -2 %
Aggregate correction factor for the #100 sieve (% passing) -1.7 %
Aggregate correction factor for the #200 sieve (% passing) -1.6 %
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 100 %
Cumulative percent passing the 3/8 in. sieve 98 %
Cumulative percent passing the #4 sieve 74 %
Cumulative percent passing the #8 sieve 57 %
Cumulative percent passing the #16 sieve 42 %
Cumulative percent passing the #30 sieve 30 %
Cumulative percent passing the #50 sieve 20 %
Cumulative percent passing the #100 sieve 13 %
Cumulative percent passing the #200 sieve 8.6 %