Print Report | Back to Sample Detail

Sample Record for 2025-09-11-45

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1001227 DEA: 074V5004 EFIS: 0723000160 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-210-R24.7/R25.3
Work Description: OVERLAY AC SHOULDER, REPLACE SHOULDER, AND SLAB REPLACEMENT.
Location Description: LOS ANGELES COUNTY IN PASADENA FROM 0.1 MILE EAST OF ORANGE GROVE BOULEVARD OVERCROSSING TO 0.2 MILE WEST OF MARENGO AVENUE OVERCROSSING
Contractor Name: CALMEX ENGINEERING, INC.
Contractor Address: 2750 South Lilac Avenue, Bloomington CA 92316
Resident Engineer: Ali Shalviri Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2025-09-11-45
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 09/11/2025
Date that the sample was received by the laboratory/organization performing the testing: 09/18/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: All American Asphalt Corona

Material Information

Performance Grade: PG 64-10
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 7

DIME Test ID: 2025-09-11-45-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 09/24/2025
Date Tested: 09/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Specific Gravity 1.018

Test 2 of 7

DIME Test ID: 2025-09-11-45-2
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 09/24/2025
Date Tested: 09/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Is mass change correction factor needed? Yes
Any material loss from containers during heating process/testing? No
Mass of container #1 before test (m1i) 203.822 grams
Mass of container #2 before test (m2i) 207.869 grams
Mass of container #1 after test (m1f) 203.781 grams
Mass of container #2 after test (m2f) 207.829 grams
Average mass change -0.11 percent
Mass of empty container #1 168.838 grams
Mass of empty container #2 172.878 grams
Mass correction factor 0.006

Test 3 of 7

DIME Test ID: 2025-09-11-45-3
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/24/2025
Date Tested: 09/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 82.6 degree
Dynamic Shear, G*/sin(δ) 3.43 kPa

Test 4 of 7

DIME Test ID: 2025-09-11-45-4
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/24/2025
Date Tested: 09/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 86.6 degree
Dynamic Shear, G*/sin(δ) 1.35 kPa

Test 5 of 7

DIME Test ID: 2025-09-11-45-5
Test Method: AASHTO T316-22: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 09/24/2025
Date Tested: 09/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s? Pa-s
Time of test 9:42 HH:MM
Test Temperature 135 C
Speed 100 rpm
Spindle size 21 in
Torque 77 %
Viscosity reading #1 (A) 0.381 Pa-s
Viscosity reading #2 (B) 0.387 Pa-s
Viscosity reading #3 (C) 0.387 Pa-s
Average viscosity 0.385 Pa-s

Test 6 of 7

DIME Test ID: 2025-09-11-45-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 09/24/2025
Date Tested: 09/22/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? NA
Soluble, percent 99.7 %
Insoluble, percent 0.3 %

Test 7 of 7

DIME Test ID: 2025-09-11-45-7
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 10/01/2025
Date Tested: 09/25/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested One
Ductility of test #1 (D1) 22 cm
Ductility of sample 22 cm