Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1000538 DEA: 042Q6104 EFIS: 0419000030
QA Service Level: 1
DIST-CO-RTE-PM: 04-NAP-29-R7.3/13.5
Work Description: COLD PLANE, RHMA OVERLAY, INSTALL MGS, CURB RAMP, AND RUMBLE STRIP.
Location Description: NAPA COUNTY IN AND NEAR NAPA FROM 0.2 MILE NORTH OF NAPA RIVER BRIDGE OVERHEAD TO 0.1 MILE SOUTH OF SIERRA AVENUE.
Contractor Name: GRANITE ROCK COMPANY
Contractor Address: 2280 Bates Avenue, Suite 200, Concord, CA 94520
Resident Engineer: Paramdeep Brar Structure Rep.: Nana Budu
DIME Sample ID: 2025-08-12-101
TL Number from the TL Form:
Sample Submitted By Organization: CT D04 - Concord Field Laboratory
Sample Organization Contact: (510) 714-7019
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 08/12/2025
Date that the sample was received by the laboratory/organization performing the testing: 08/13/2025
The quantity of what the sample constitutes: 750 Tons
A brief description of the sample: 1/2 RHMA-G
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan Lake Herman Drum Plant
DIME Test ID: 2025-08-12-101-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 09/16/2025
Date Tested: 09/08/2025
Submitted By Organization: CT D04 - Concord Field Laboratory
Organization Address: 2525 Stanwell Drive, Suite 100,
Organization City: Concord
Organization State: CA
Organization Zipcode: 94520
Organization Email: gurind.joshi@dot.ca.gov
Organization Phone: (510) 714-7019
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
|
What temperature unit is used?
|
Celsius
|
|
Test procedure used?
|
Method A
|
|
Mass of HMA Sample prior to ignition
|
1589.5 g
|
|
Corrected Asphalt Binder Content
|
9.43 %
|
|
Mass Loss
|
177.4 g
|
|
Correction Factor (Percent by mass of HMA Specimen)
|
1.54 %
|
|
Moisture Content
|
no data0 %
|
|
Temperature Compensation Factor
|
0.19 %
|
|
Test Temperature
|
482 C
|
DIME Test ID: 2025-08-12-101-2
Test Method: AASHTO T209-22: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 09/16/2025
Date Tested: 08/15/2025
Submitted By Organization: CT D04 - Concord Field Laboratory
Organization Address: 2525 Stanwell Drive, Suite 100,
Organization City: Concord
Organization State: CA
Organization Zipcode: 94520
Organization Email: gurind.joshi@dot.ca.gov
Organization Phone: (510) 714-7019
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
|
Number of Samples
|
1
|
|
What is the unit of measurement for theoretical density?
|
SI Units
|
|
Mass Determination
|
Air
|
|
Specific Gravity for Sample 1
|
2.394
|
|
Theoretical maximum density at 25°C (77°F)
|
2387 kg/m^3
|