Sample Record for 2025-08-27-43
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 1001219 DEA: 021J8904 EFIS: 0221000006
QA Service Level: 1
DIST-CO-RTE-PM: 02-SHA-5-R30.5/R31.0
Work Description: REPLACE PAVEMENT AND PLACE POLYESTER CONCRETE OVERLAY.
Location Description: SHASTA COUNTY NEAR O\'BRIEN FROM 0.1 MILE SOUTH OF TUNNEL GULCH VIADUCT TO THE O\'BRIEN REST AREA
Contractor Name: MCCUEN CONSTRUCTION, INC.
Contractor Address: 3269 SWETZER ROAD, Loomis CA 95650
Resident Engineer: Kyle Higgins Structure Rep.: Chris Brace
Sample Information
DIME Sample ID: 2025-08-27-43
TL Number from the TL Form:
Sample Submitted By Organization: Atlas - Denver
Sample Organization Contact: 303-975-9959
Type of Sample: Quality Assurance
Type of Material: Asphalt Binder
Sample Taken Date: 08/27/2025
Date that the sample was received by the laboratory/organization performing the testing: 09/03/2025
The quantity of what the sample constitutes: 2 cans
A brief description of the sample: PG 58-22
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: JF Shea Fawndale
Material Information
Performance Grade: PG 58-22
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier: JF SHEA FAWNDALE
Certified Asphalt Supplier: Valero Marketing & Supply - Benicia CA
Multigrade: Yes
Multigrade Type: PG 58-22 / PG 58-16
Asphalt Binder Mix Number:
Test Results
Test
DIME Test ID: 2025-08-27-43-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/03/2025
Date Tested: 09/22/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: Original
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
Original binder
|
|
Test Gap
|
1 mm
|
|
Test Frequency
|
10.0 rad/s
|
|
Strain Amplitude
|
12.06 %
|
|
Stress Amplitude
|
0.274 kPa
|
|
Phase Angle (δ) (for the 10 cycles)
|
85.1 degree
|
|
Complex Modulus (G*) (for the 10 measurements)
|
2.271 kPa
|
|
Test Temperature (Specimen 1)
|
58.0 C
|
|
Dynamic Shear, G*/sin(δ)
|
2.28 kPa
|
Test
DIME Test ID: 2025-08-27-43-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/03/2025
Date Tested: 09/29/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: RTFO
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
RTFO residue
|
|
Test Gap
|
1 mm
|
|
Test Frequency
|
10.0 rad/s
|
|
Strain Amplitude
|
10.05 %
|
|
Stress Amplitude
|
0.535 kPa
|
|
Phase Angle (δ) (for the 10 cycles)
|
82.5 degree
|
|
Complex Modulus (G*) (for the 10 measurements)
|
5.321 kPa
|
|
Test Temperature (Specimen 1)
|
58.0 C
|
|
Dynamic Shear, G*/sin(δ)
|
5.37 kPa
|
Test
DIME Test ID: 2025-08-27-43-3
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Submitted By Organization: Atlas - Denver
Organization Address: 627 Sheridan Boulevard,
Organization City: Lakewood
Organization State: CO
Organization Zipcode: 80214
Organization Email:
Organization Phone: 303-975-9959
This test has been superseded on 10/03/2025. The corrected test ID is: 2025-08-27-43-8
Reason: retested
Test
DIME Test ID: 2025-08-27-43-4
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 10/03/2025
Date Tested: 09/25/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: BBR
Test Result Compliance: complies
Additional Comments When Verified:
|
Time test started
|
no data HH:MM:SS
|
|
Flags issued by software during test
|
no data
|
|
Correlation coefficient (R²)
|
no data0
|
|
Regression coefficient a
|
no data
|
|
Regression coefficient b
|
no data
|
|
Regression coefficient c
|
no data
|
|
Load at time 0.0
|
no data0 mN
|
|
Deflection at time 0.0 s
|
no data0 µm
|
|
Load at time 0.5 s
|
no data0 mN
|
|
Deflection at time 0.5 s
|
no data0 µm
|
|
Load at 60.0 s
|
no data0 mN
|
|
Beam deflection 60.0 s
|
no data0 µm
|
|
Measured Stiffness Modulus 60.0 s
|
no data
|
|
Estimated Stiffness Modulus 60.0 s
|
198.5 MPa
|
|
Difference between stiffness moduli 60.0 s
|
no data
|
|
Estimated m-value 60.0 s
|
0.341
|
Test
DIME Test ID: 2025-08-27-43-7
Test Method: AASHTO T316-22: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 10/03/2025
Date Tested: 09/26/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: Viscosity @135C
Test Result Compliance: complies
Additional Comments When Verified:
|
Is viscosity reading in cP/Pa-s?
|
cP
|
|
Time of test
|
00:00 HH:MM
|
|
Test Temperature
|
135 C
|
|
Speed
|
20 rpm
|
|
Spindle size
|
.463 in
|
|
Torque
|
13.1 %
|
|
Viscosity reading #1 (A)
|
327.5 cP
|
|
Viscosity reading #2 (B)
|
327.5 cP
|
|
Viscosity reading #3 (C)
|
327.5 cP
|
|
Average viscosity
|
327.5 Pa-s
|
Test
DIME Test ID: 2025-08-27-43-5
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 10/03/2025
Date Tested: 09/25/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: Ductility
Test Result Compliance: complies
Additional Comments When Verified:
|
Is a normal test obtainable?
|
Yes
|
|
Number of replicates tested
|
Three
|
|
Ductility of test #1 (D1)
|
150 cm
|
|
Ductility of test #2 (D2)
|
150 cm
|
|
Ductility of test #3 (D3)
|
150 cm
|
|
Ductility of sample
|
150 cm
|
Test
DIME Test ID: 2025-08-27-43-6
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 10/03/2025
Date Tested: 09/18/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: Mass Change
Test Result Compliance: complies
Additional Comments When Verified:
|
Is mass change based on one or two containers?
|
Two
|
|
Is mass change correction factor needed?
|
Yes
|
|
Any material loss from containers during heating process/testing?
|
no data
|
|
Mass of container #1 before test (m1i)
|
209.263 grams
|
|
Mass of container #2 before test (m2i)
|
204.658 grams
|
|
Mass of container #1 after test (m1f)
|
209.152 grams
|
|
Mass of container #2 after test (m2f)
|
204.556 grams
|
|
Average mass change
|
-0.275 percent
|
|
Mass of empty container #1
|
174.503 grams
|
|
Mass of empty container #2
|
169.623 grams
|
|
Mass correction factor
|
0.03
|
Test
DIME Test ID: 2025-08-27-43-8
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/03/2025
Date Tested: 10/03/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: PAV
The test was superseded from test ID: 2025-08-27-43-3
Test Result Compliance: not applicable
Additional Comments When Verified:
|
Phase
|
PAV residue
|
|
Test Plate Diameter
|
8 mm
|
|
Test Gap
|
2 mm
|
|
Test Frequency
|
10.0 rad/s
|
|
Strain Amplitude
|
1.00 %
|
|
Stress Amplitude
|
66.280 kPa
|
|
Phase Angle (δ) (for the 10 cycles)
|
49.8 degree
|
|
Complex Modulus (G*) (for the 10 measurements)
|
0.000 kPa
|
|
Test Temperature (Specimen 1)
|
22.0 C
|
|
(G*) x sin(δ)=
|
5037 kPa
|
Test
DIME Test ID: 2025-08-27-43-9
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/03/2025
Date Tested: 09/25/2025
Submitted By Organization: Atlas - Denver
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ian.broddrick@dot.ca.gov
Organization Phone: (916) 741-2680
General Comments for this Test: PAV +3C
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
PAV residue
|
|
Test Plate Diameter
|
8 mm
|
|
Test Gap
|
2 mm
|
|
Test Frequency
|
10.0 rad/s
|
|
Strain Amplitude
|
1.01 %
|
|
Stress Amplitude
|
43.028 kPa
|
|
Phase Angle (δ) (for the 10 cycles)
|
52.2 degree
|
|
Complex Modulus (G*) (for the 10 measurements)
|
4281.234 kPa
|
|
Test Temperature (Specimen 1)
|
25.0 C
|
|
(G*) x sin(δ)=
|
3383 kPa
|