Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214135 DEA: 09213404 EFIS: 0900000030
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-29.9/41.8
Work Description: ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT.
Location Description: INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE
Contractor Name: FISHER SAND & GRAVEL CO.
Contractor Address: 1302 W DRIVERS WAY, TEPE, AZ. 85284
Resident Engineer: Kris Raber Structure Rep.: Sheila Reyes
DIME Sample ID: 2025-08-25-71
TL Number from the TL Form:
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 08/25/2025
Date that the sample was received by the laboratory/organization performing the testing: 08/26/2025
The quantity of what the sample constitutes: 1 Day Pour
A brief description of the sample: 3 4x8 PCC Cylinders
From where was the sample collected: Job Site
Laboratory sample identification: PCC-012
Structure unique identifier:
Structure name: Light Wall
The fabricator/manufacturer/facility name: 7/11 Bishop
The concrete mix design number: 0
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 0
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Light Wall
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
DIME Test ID: 2025-08-25-71-2
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 10/01/2025
Date Tested: 09/22/2025
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: PCC-012
Test Result Compliance: complies
Additional Comments When Verified:
|
Unit system used?
|
US Units
|
|
Number of specimens
|
3
|
|
Test performed
|
With no density determined
|
|
Capped in accordance with?
|
ASTM C1231 - Unbonded Elastomeric Pad Cap
|
|
Average diameter of cylinder 1
|
4.00 in
|
|
Average diameter of cylinder 2
|
4.00 in
|
|
Average diameter of cylinder 3
|
4.00 in
|
|
Cross sectional area of cylinder 1
|
12.57 in^2
|
|
Cross sectional area of cylinder 2
|
12.57 in^2
|
|
Cross sectional area of cylinder 3
|
12.57 in^2
|
|
Compressive strength (to nearest 10 psi)
|
4320 psi
|
|
Maximum load on cylinder 1
|
53490 lb
|
|
Maximum load on cylinder 2
|
55160 lb
|
|
Maximum load on cylinder 3
|
54280 lb
|
|
Compressive strength of cylinder 1
|
4255.4 psi
|
|
Type of fracture pattern of cylinder 1
|
1
|
|
Compressive strength of cylinder 2
|
4388.2 psi
|
|
Compressive strength of cylinder 3
|
4318.2 psi
|
|
Type of fracture pattern of cylinder 2
|
1
|
|
Type of fracture pattern of cylinder 3
|
1
|
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
|
Correction factor for cylinder 1
|
1
|
|
Correction factor for cylinder 2
|
1
|
|
Correction factor for cylinder 3
|
1
|
|
Age of specimen
|
28 days
|
|
Age of specimen in hours
|
no data0 hours
|