Project ID: 1000682 DEA: 09379104 EFIS: 0919000005
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-91.6/100.8
Work Description: CONSTRUCT HMA, CURB RAMPS, AND ELECTRICAL SYSTEMS.
Location Description: INYO COUNTY AT AND NEAR BIG PINE FROM 0.1 MILE SOUTH OF ELNA ROAD TO SOUTH JUNCTION ROUTE 168
Contractor Name: ROAD AND HIGHWAY BUILDERS, LLC.
Contractor Address: P.O. Box 70846, Reno, N V, 89570
Resident Engineer: Adam Zumstein Structure Rep.: Unknown
DIME Sample ID: 2025-08-20-27
TL Number from the TL Form:
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 08/20/2025
Date that the sample was received by the laboratory/organization performing the testing: 08/20/2025
The quantity of what the sample constitutes: up to 750 tons
A brief description of the sample: HMA64
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RHB Plant Independence
DIME Test ID: 2025-08-20-27-1
Test Method: AASHTO T209-22: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 08/25/2025
Date Tested: 08/21/2025
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-64
Test Result Compliance: complies
Additional Comments When Verified:
|
Number of Samples
|
1
|
|
What is the unit of measurement for theoretical density?
|
US Units
|
|
Mass Determination
|
Air
|
|
Method Performed
|
Mechanical Agitation - Method A
|
|
Mass of container filled with water 1
|
7310.5 grams
|
|
Mass of oven-dry sample in air for Sample 1
|
2239.6 grams
|
|
Mass of container filled with the sample and water for Sample 1
|
8647.3 grams
|
|
Temperature of Water
|
77 °F
|
|
Specific Gravity for Sample 1
|
2.481
|
|
Theoretical maximum density at 25°C (77°F)
|
154.4 lb/ft^3
|
DIME Test ID: 2025-08-20-27-2
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 08/25/2025
Date Tested: 08/21/2025
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-64 PP Gradation
Test Result Compliance: complies
Additional Comments When Verified:
|
Is an aggregate correction factor used?
|
Yes
|
|
Aggregate correction factor for the 2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 1/2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 3/4 in. sieve (% passing)
|
0.5 %
|
|
Aggregate correction factor for the 1/2 in. sieve (% passing)
|
1.8 %
|
|
Aggregate correction factor for the 3/8 in. sieve (% passing)
|
2.2 %
|
|
Aggregate correction factor for the #4 sieve (% passing)
|
2.2 %
|
|
Aggregate correction factor for the #8 sieve (% passing)
|
2.1 %
|
|
Aggregate correction factor for the #16 sieve (% passing)
|
1.6 %
|
|
Aggregate correction factor for the #30 sieve (% passing)
|
0.5 %
|
|
Aggregate correction factor for the #50 sieve (% passing)
|
0.3 %
|
|
Aggregate correction factor for the #100 sieve (% passing)
|
0.3 %
|
|
Aggregate correction factor for the #200 sieve (% passing)
|
1.1 %
|
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
98 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
84 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
76 %
|
|
Cumulative percent passing the #4 sieve
|
49 %
|
|
Cumulative percent passing the #8 sieve
|
35 %
|
|
Cumulative percent passing the #16 sieve
|
27 %
|
|
Cumulative percent passing the #30 sieve
|
18 %
|
|
Cumulative percent passing the #50 sieve
|
12 %
|
|
Cumulative percent passing the #100 sieve
|
7 %
|
|
Cumulative percent passing the #200 sieve
|
6 %
|
DIME Test ID: 2025-08-20-27-3
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 08/25/2025
Date Tested: 08/21/2025
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-64
Test Result Compliance: complies
Additional Comments When Verified:
|
What temperature unit is used?
|
Celsius
|
|
Test procedure used?
|
Method A
|
|
Mass of the specimen basket assembly
|
4253.6 g
|
|
Mass of the specimen and specimen basket assembly prior to ignition
|
6526.6 g
|
|
Mass of HMA Sample prior to ignition
|
2273 g
|
|
Corrected Asphalt Binder Content
|
5.07 %
|
|
Mass Loss
|
124.3 g
|
|
Mass of aggregate remaining after ignition
|
2148.7 g
|
|
Correction Factor (Percent by mass of HMA Specimen)
|
0.4 %
|
|
Moisture Content
|
no data0 %
|
|
Temperature Compensation Factor
|
no data0 %
|
|
Test Temperature
|
538 C
|