Print Report | Back to Sample Detail

Sample Record for 2025-07-29-27

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1001144 DEA: 033G1304 EFIS: 0323002344 QA Service Level: 1
DIST-CO-RTE-PM: 03-YOL-VAR,16,113-0/0
Work Description: FURNISH AND PLACE POLYESTER CONCRETE OVERLAY.
Location Description: YOLO COUNTY AT VARIOUS LOCATIONS
Contractor Name: DEES BURKE ENGINEERING CONSTRUCTORS, LLC
Contractor Address: Unknown
Resident Engineer: Luis Pompa Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2025-07-29-27
TL Number from the TL Form:
Sample Submitted By Organization: CT SC - 3665 - Sacramento
Sample Organization Contact: (916) 768-8293
Type of Sample: Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 07/29/2025
Date that the sample was received by the laboratory/organization performing the testing: 07/29/2025
The quantity of what the sample constitutes: METHACRYLATE OVERLAY
A brief description of the sample: Meth Bridge Deck
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier: 22-0122
Structure name: County Road 27 OC
The fabricator/manufacturer/facility name: DBE

Material Information

Pavement Surface Type: Methacrylate Resin
Type of Traffic Control Provided: Stationary Lane Closure
DIST-CO-RTE: 03-YOL-113
Direction of Travel: East
Post Mile: 6.11
Lanes to be Tested: Shoulder,Lane #1,Lane #2
Station:

Test Results

Test 1 of 1

DIME Test ID: 2025-07-29-27-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 08/01/2025
Date Tested: 07/31/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: CO ROAD 27 BRIDGE APPROACH SLAB-..40-.40-.40 AVG=.40 DEPARTURE SLAB-.40-.40-.40 AVG= .40
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.41