Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1000682 DEA: 09379104 EFIS: 0919000005
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-91.6/100.8
Work Description: CONSTRUCT HMA, CURB RAMPS, AND ELECTRICAL SYSTEMS.
Location Description: INYO COUNTY AT AND NEAR BIG PINE FROM 0.1 MILE SOUTH OF ELNA ROAD TO SOUTH JUNCTION ROUTE 168
Contractor Name: ROAD AND HIGHWAY BUILDERS, LLC.
Contractor Address: P.O. Box 70846, Reno, N V, 89570
Resident Engineer: Adam Zumstein Structure Rep.: Unknown
DIME Sample ID: 2025-06-17-129
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 06/17/2025
Date that the sample was received by the laboratory/organization performing the testing: 07/23/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HOT PLANT-FISH SPRINGS
Performance Grade: PG 58-34
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2025-06-17-129-4
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/12/2025
Date Tested: 07/24/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
RTFO residue
|
|
Phase Angle (δ) (for the 10 cycles)
|
61.5 degree
|
|
Dynamic Shear, G*/sin(δ)
|
3.82 kPa
|
DIME Test ID: 2025-06-17-129-3
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/12/2025
Date Tested: 07/24/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
Original binder
|
|
Phase Angle (δ) (for the 10 cycles)
|
64.7 degree
|
|
Dynamic Shear, G*/sin(δ)
|
1.80 kPa
|
DIME Test ID: 2025-06-17-129-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 08/12/2025
Date Tested: 07/24/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Was test performed on residue from distillation or evaporation?
|
NA
|
|
Soluble, percent
|
99.9 %
|
|
Insoluble, percent
|
0.1 %
|
DIME Test ID: 2025-06-17-129-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 08/12/2025
Date Tested: 07/24/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is viscosity reading in cP/Pa-s?
|
Pa-s
|
|
Time of test
|
9:03 HH:MM
|
|
Test Temperature
|
135 C
|
|
Speed
|
50 rpm
|
|
Spindle size
|
21 in
|
|
Torque
|
61.1 %
|
|
Viscosity reading #1 (A)
|
0.607 Pa-s
|
|
Viscosity reading #2 (B)
|
0.615 Pa-s
|
|
Viscosity reading #3 (C)
|
0.611 Pa-s
|
|
Average viscosity
|
0.611 Pa-s
|
DIME Test ID: 2025-06-17-129-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 08/12/2025
Date Tested: 07/24/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
DIME Test ID: 2025-06-17-129-2
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 08/12/2025
Date Tested: 07/24/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is mass change based on one or two containers?
|
Two
|
|
Is mass change correction factor needed?
|
Yes
|
|
Average mass change
|
-0.307 percent
|
|
Mass correction factor
|
0.006
|
DIME Test ID: 2025-06-17-129-7
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 09/26/2025
Date Tested: 08/14/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
% Elongation Recovery
|
88 %
|
DIME Test ID: 2025-06-17-129-8
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 09/26/2025
Date Tested: 09/20/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Time test started
|
no data HH:MM:SS
|
|
Flags issued by software during test
|
no data
|
|
Correlation coefficient (R²)
|
no data0
|
|
Regression coefficient a
|
no data
|
|
Regression coefficient b
|
no data
|
|
Regression coefficient c
|
no data
|
|
Load at time 0.0
|
no data0 mN
|
|
Deflection at time 0.0 s
|
no data0 µm
|
|
Load at time 0.5 s
|
no data0 mN
|
|
Deflection at time 0.5 s
|
no data0 µm
|
|
Load at 60.0 s
|
no data0 mN
|
|
Beam deflection 60.0 s
|
no data0 µm
|
|
Measured Stiffness Modulus 60.0 s
|
no data
|
|
Estimated Stiffness Modulus 60.0 s
|
245.525 MPa
|
|
Difference between stiffness moduli 60.0 s
|
no data
|
|
Estimated m-value 60.0 s
|
0.324
|
DIME Test ID: 2025-06-17-129-9
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/26/2025
Date Tested: 09/20/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
PAV residue
|
|
Test Plate Diameter
|
8 mm
|
|
Phase Angle (δ) (for the 10 cycles)
|
45.4 degree
|
|
(G*) x sin(δ)=
|
2462 kPa
|