Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1000682 DEA: 09379104 EFIS: 0919000005
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-91.6/100.8
Work Description: CONSTRUCT HMA, CURB RAMPS, AND ELECTRICAL SYSTEMS.
Location Description: INYO COUNTY AT AND NEAR BIG PINE FROM 0.1 MILE SOUTH OF ELNA ROAD TO SOUTH JUNCTION ROUTE 168
Contractor Name: ROAD AND HIGHWAY BUILDERS, LLC.
Contractor Address: P.O. Box 70846, Reno, N V, 89570
Resident Engineer: Adam Zumstein Structure Rep.: Unknown
DIME Sample ID: 2025-06-24-25
TL Number from the TL Form: CR-8
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 06/24/2025
Date that the sample was received by the laboratory/organization performing the testing: 06/25/2025
The quantity of what the sample constitutes: 500 Tons
A brief description of the sample: 3/4" HMA Cores
From where was the sample collected: Job Site
Laboratory sample identification: 4664
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RHB Plant Independence
DIME Test ID: 2025-06-24-25-1
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Verified Date: 06/25/2025
Date Tested: 06/25/2025
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: Density: CR-8A=95.9%, CR-8B=94.3%
Test Result Compliance: complies
Additional Comments When Verified:
|
Percent Air Voids
|
4.1 %
|
|
Percent Air Voids 2
|
5.7 %
|
|
Average Percent Air Voids
|
4.9 %
|
|
Average Core Density
|
95.1 %
|