Print Report | Back to Sample Detail

Sample Record for 2025-06-24-15

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000114 DEA: 060W8204 EFIS: 0617000304 QA Service Level: 1
DIST-CO-RTE-PM: 06-KIN-41-28.4/R40.1
Work Description: COLD PLANE WITH HOT MIX ASPHALT (TYPE A) AND RHMA-G.
Location Description: KINGS COUNTY AT AND NEAR STRATFORD FROM NEVADA AVENUE TO ROUTE 41/198 SEPARATION
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 2716 S Granite Ct, Fresno, CA 93706
Resident Engineer: Oscar Sherrill Structure Rep.: Martin Garcia

Sample Information

DIME Sample ID: 2025-06-24-15
TL Number from the TL Form:
Sample Submitted By Organization: CT D06 - Millbrook Field Laboratory
Sample Organization Contact: (559) 341-3953
Type of Sample: Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 06/24/2025
Date that the sample was received by the laboratory/organization performing the testing: 06/24/2025
The quantity of what the sample constitutes: 63tons
A brief description of the sample: 3/4 HMA
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Coalinga HMA Plant

Material Information

HMA Type: Type A HMA
HMA Grading: 3/4 inch
Lot number: 5
Sublot number: 3
HMA Mix Number: 1466s
Binder content (%):
Virgin binder PG:
Design binder PG:
Binder Supplier:
RAP content (%):
WMA Additives:
Antistrip type:

Test Results

Test 1 of 1

DIME Test ID: 2025-06-24-15-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 06/25/2025
Date Tested: 06/25/2025
Submitted By Organization: CT D06 - Millbrook Field Laboratory
Organization Address: 1352 W. Olive Ave,
Organization City: Fresno
Organization State: CA
Organization Zipcode: 93728
Organization Email: tomas.silva@dot.ca.gov
Organization Phone: (559) 417-5341
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used? Celsius
Test procedure used? Method A
Mass of the specimen basket assembly 4041.2 g
Mass of the specimen and specimen basket assembly prior to ignition 6263.3 g
Mass of HMA Sample prior to ignition 2222.1 g
Corrected Asphalt Binder Content 4.75 %
Mass Loss 137.4 g
Mass of aggregate remaining after ignition 2084.7 g
Correction Factor (Percent by mass of HMA Specimen) 1.43 %
Moisture Content no data0 %
Temperature Compensation Factor no data0 %
Test Temperature 538 C