Print Report | Back to Sample Detail

Sample Record for 2025-04-13-26

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994586 DEA: 081C08U4 EFIS: 0822000142 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-10-R134.0/R156.5
Work Description: PLACE HMA (TYPE A), JPCP, IMPORTED BORROW, ROADWAY EXCAVATION & CL2 AB
Location Description: RIVERSIDE COUNTY FROM 1.1 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE
Contractor Name: FISHER SAND & GRAVEL CO.
Contractor Address: 19062 San Jose Avenue, LA Puente, CA 91748
Resident Engineer: Ryan Espoy (cc on Reports) Structure Rep.: Tim Flores

Sample Information

DIME Sample ID: 2025-04-13-26
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 04/13/2025
Date that the sample was received by the laboratory/organization performing the testing: 04/21/2025
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Fisher Sand and Gravel-Tempe

Material Information

Performance Grade: PG 58-34
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Holly Frontier Asphalt Company - Glendale AZ
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 9

DIME Test ID: 2025-04-13-26-4
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 06/02/2025
Date Tested: 05/19/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 63.8 degree
Dynamic Shear, G*/sin(δ) 2.89 kPa

Test 2 of 9

DIME Test ID: 2025-04-13-26-3
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 06/02/2025
Date Tested: 05/19/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 65.1 degree
Dynamic Shear, G*/sin(δ) 1.51 kPa

Test 3 of 9

DIME Test ID: 2025-04-13-26-2
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 06/02/2025
Date Tested: 05/16/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Average mass change -0.171 percent

Test 4 of 9

DIME Test ID: 2025-04-13-26-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 06/02/2025
Date Tested: 05/19/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? NA
Soluble, percent 99.9 %
Insoluble, percent 0.1 %

Test 5 of 9

DIME Test ID: 2025-04-13-26-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 06/02/2025
Date Tested: 05/16/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Specific Gravity 1.016

Test 6 of 9

DIME Test ID: 2025-04-13-26-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 06/02/2025
Date Tested: 05/16/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s? Pa-s
Time of test 7:48 HH:MM
Test Temperature 135 C
Speed 20 rpm
Spindle size 21 in
Torque 26.7 %
Viscosity reading #1 (A) 0.664 Pa-s
Viscosity reading #2 (B) 0.654 Pa-s
Viscosity reading #3 (C) 0.669 Pa-s
Average viscosity 0.662 Pa-s

Test 7 of 9

DIME Test ID: 2025-04-13-26-7
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 08/06/2025
Date Tested: 06/04/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
% Elongation Recovery 90 %

Test 8 of 9

DIME Test ID: 2025-04-13-26-8
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 08/06/2025
Date Tested: 08/06/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Time test started no data HH:MM:SS
Flags issued by software during test no data
Correlation coefficient (R²) no data0
Regression coefficient a no data
Regression coefficient b no data
Regression coefficient c no data
Load at time 0.0 no data0 mN
Deflection at time 0.0 s no data0 µm
Load at time 0.5 s no data0 mN
Deflection at time 0.5 s no data0 µm
Load at 60.0 s no data0 mN
Beam deflection 60.0 s no data0 µm
Measured Stiffness Modulus 60.0 s no data
Estimated Stiffness Modulus 60.0 s 287.481 MPa
Difference between stiffness moduli 60.0 s no data
Estimated m-value 60.0 s 0.352

Test 9 of 9

DIME Test ID: 2025-04-13-26-9
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 08/06/2025
Date Tested: 08/06/2025
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 50.9 degree
(G*) x sin(δ)= 2175 kPa