Print Report | Back to Sample Detail

Sample Record for 2025-04-22-88

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 995002 DEA: 010H5804 EFIS: 0117000238 QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-299-R7.6/R29.2
Work Description: RHMA, HMA AND REPLACE AC SURFACING.
Location Description: HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.5 MILE EAST OF BLUE LAKE BOULEVARD TO 0.1 MILE EAST OF TITLOW HILL ROW
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 215 I STREET, EUREKA, CA 95501
Resident Engineer: Robin Collins Structure Rep.: Adlai Evans

Sample Information

DIME Sample ID: 2025-04-22-88
TL Number from the TL Form: 972443
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Production Start-Up
Type of Material: Asphalt Rubber Binder
Sample Taken Date: 04/22/2025
Date that the sample was received by the laboratory/organization performing the testing: 05/19/2025
The quantity of what the sample constitutes: 2 cans
A brief description of the sample: Start UP - Asphalt Rubber Binder
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Kernan Blue Lake

Material Information

Asphalt modifier supplier:
Performance Grade: PG 64-16
Lot number: 1
Sublot number: 1
Asphalt Rubber Binder Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2025-04-22-88-1
Test Method: ASTM D217-21: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Verified Date: 05/23/2025
Date Tested: 05/21/2025
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Cone Penetration
Test Result Compliance: complies
Additional Comments When Verified:
Determination Unworked Penetration
Unworked Penetration 37 0.1 mm

Test 2 of 3

DIME Test ID: 2025-04-22-88-2
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Verified Date: 05/23/2025
Date Tested: 05/21/2025
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Ring Ball
Test Result Compliance: complies
Additional Comments When Verified:
ASTM Thermometer used? C
Softening Point Sample 1 69 C
Softening Point Sample 2 70 C
Bath Liquid freshly boiled distilled water
Minutes Reaction no data

Test 3 of 3

DIME Test ID: 2025-04-22-88-3
Test Method: ASTM D5329-20: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Verified Date: 05/23/2025
Date Tested: 05/21/2025
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Resilience
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 25 C
Ball Penetration (P1) 5 mm
Final Dial reading (F1) 72 mm
Ball Penetration (P2) 5 mm
Final Dial reading (F2) 73 mm
Ball Penetration (P3) 4 mm
Final Dial reading (F3) 70 mm
Resilience 1 33 %
Resilience 2 32 %
Resilience 3 34 %
Average Resilience 33 %
Minutes Reaction no data