Print Report | Back to Sample Detail

Sample Record for 2025-04-11-17

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000259 DEA: 050N74V4 EFIS: 0522000043 QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-101-9.2/9.7
Work Description:
Location Description: FOR CONSTRUCTION ON STATE HIGHWAY IN SANTA BARBARA COUNTY AT MONTECITO FROM 0.2 MILE NORTH OF SHEFFIELD DRIVE UNDERCROSSING TO 0.3 MILE SOUTH OF SAN YSIDRO ROAD OVERCROSSING
Contractor Name: Granite Construction Company
Contractor Address: P.O. Box 6744, Santa Barbara, CA 93160
Resident Engineer: Taylor Merlo Structure Rep.: Emiliano Berntsen

Sample Information

DIME Sample ID: 2025-04-11-17
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Sample Organization Contact: (805) 621-3616
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 04/11/2025
Date that the sample was received by the laboratory/organization performing the testing: 04/11/2025
The quantity of what the sample constitutes: 130 CY
A brief description of the sample: 1 x 4 PCC Aggregates
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Padaro Plant

Material Information

The concrete mix design number: 231 R
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 17092
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Discharge from concrete truck into wheelbarrow.
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 5

DIME Test ID: 2025-04-11-17-1
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Verified Date: 04/15/2025
Date Tested: 04/11/2025
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 63 F

Test 2 of 5

DIME Test ID: 2025-04-11-17-2
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 04/15/2025
Date Tested: 04/11/2025
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Air Content 3 %

Test 3 of 5

DIME Test ID: 2025-04-11-17-3
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Verified Date: 04/15/2025
Date Tested: 04/11/2025
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Ball penetration in freshly mixed concrete (average) 2.25 inch

Test 4 of 5

DIME Test ID: 2025-04-11-17-4
Test Method: CTM 523-May 2020: Method of Test for Flexural Strength of Concrete
Verified Date: 07/22/2025
Date Tested: 05/09/2025
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Number of specimens 2
Unit system used? US Units
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Is a beam dimensional correction factor used? Yes
Modulus of rupture average 660 psi
Modulus of rupture 680 psi
Modulus of rupture 2 640 psi
Age of specimen 28 days

Test 5 of 5

DIME Test ID: 2025-04-11-17-5
Test Method: CTM 523-May 2020: Method of Test for Flexural Strength of Concrete
Verified Date: 07/22/2025
Date Tested: 04/22/2025
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Number of specimens 2
Unit system used? US Units
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Is a beam dimensional correction factor used? Yes
Modulus of rupture average 545 psi
Modulus of rupture 570 psi
Modulus of rupture 2 515 psi
Age of specimen 11 days