Print Report | Back to Sample Detail

Sample Record for 2025-03-19-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 995125 DEA: 101E3004 EFIS: 1018000273 QA Service Level: 1
DIST-CO-RTE-PM: 10-SJ-5-32.5/49.8
Work Description: REMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT.
Location Description: SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE
Contractor Name: BAY CITIES PAVING & GRADING, INC.
Contractor Address: 1450 Civic Court, Building B #400, Concord, CA 95351
Resident Engineer: Ariel Mendoza Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2025-03-19-5
TL Number from the TL Form:
Sample Submitted By Organization: CT SC - 3665 - Stockton
Sample Organization Contact: (916) 416-7793
Type of Sample: Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 03/19/2025
Date that the sample was received by the laboratory/organization performing the testing: 03/19/2025
The quantity of what the sample constitutes: skid testing
A brief description of the sample: CTM 342
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name: Hwy 5 SB Stockton
The fabricator/manufacturer/facility name: Bay Cities

Material Information

Pavement Surface Type: PCC (Portland Cement Concrete)
Type of Traffic Control Provided: Behind K-Rail/Barrier
DIST-CO-RTE: 10-SJ-5
Direction of Travel: South
Post Mile: 1976.00
Lanes to be Tested: Shoulder,Lane #3
Station:

Test Results

Test 1 of 13

DIME Test ID: 2025-03-19-5-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/02/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: 8 MILE RD UC APPROACH SLAB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.37

Test 2 of 13

DIME Test ID: 2025-03-19-5-2
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: MC AULIFFE UC APPROACH SLAB
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.33

Test 3 of 13

DIME Test ID: 2025-03-19-5-3
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: BEAR CREEK UC APPROACH SLAB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.35

Test 4 of 13

DIME Test ID: 2025-03-19-5-4
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: MOSHER SLOUGH UC APPROACH SLAB
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.32

Test 5 of 13

DIME Test ID: 2025-03-19-5-5
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: HAMMER LANE APPROACH SLAB
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.32

Test 6 of 13

DIME Test ID: 2025-03-19-5-9
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: MOSHER SLOUGH UC DEPARTURE SLAB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.35

Test 7 of 13

DIME Test ID: 2025-03-19-5-6
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: 8 MILE RD UC DEPARTURE SLAB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.38

Test 8 of 13

DIME Test ID: 2025-03-19-5-7
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: MC AULIFFE UC DEPARTURE SLAB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.35

Test 9 of 13

DIME Test ID: 2025-03-19-5-8
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: BEAR CREEK UC DEPARTURE SLAB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.36

Test 10 of 13

DIME Test ID: 2025-03-19-5-10
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/03/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: HAMMER LANE UC DEPARTURE SLAB
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.33

Test 11 of 13

DIME Test ID: 2025-03-19-5-11
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/15/2025
Date Tested: 04/14/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: MC AULIFFE UC APPROACH SLAB/RETEST
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.38

Test 12 of 13

DIME Test ID: 2025-03-19-5-12
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/15/2025
Date Tested: 04/14/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: MOSHER SLOUGH UC APPROACH SLAB/RETEST
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.37

Test 13 of 13

DIME Test ID: 2025-03-19-5-13
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/15/2025
Date Tested: 04/14/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: HAMMER LANE APPROACH SLAB/RETEST
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.37