Project Information

Project ID: 214649 DEA: 07316004 EFIS: 0715000194 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-14-60.70
Work Description: REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES.
Location Description: ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE.
Contractor Name: Guy F. Atkinson Construction LLC
Contractor Address: 18201 Von Karman Ave, Suite 800, Irvine, CA 92612
Resident Engineer: James Shih Structure Rep.: Hossein Sabbagh

Sample Information

DIME Sample ID: 2025-03-07-25
TL Number from the TL Form:
Sample Submitted By Organization: Alta Vista Solutions - Whittier
Sample Organization Contact: (510) 542-9827
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 03/07/2025
Date that the sample was received by the laboratory/organization performing the testing: 01/24/2025
The quantity of what the sample constitutes: 40 CY
A brief description of the sample: JPCP Cylinders
From where was the sample collected: Job Site
Laboratory sample identification: 25-0339
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: N/A

Material Information

The concrete mix design number: SCI-12622-3
The truck number from where the sample was collected: Truck 1
The batch plant ticket number from where the sample was collected: Load 4
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Jobsite
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2025-03-07-25-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders03/14/2025Not scheduledSoCal ReportsAlta Vista Solutions - WhittierSoCal Reports