Sample Record for 2017-06-05-2
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 209141 DEA: 07215954 EFIS: 0700001835
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-5-0.0/7.6
Work Description: WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location Description: LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: Thang Ton Structure Rep.: Amare Tsagie
Sample Information
DIME Sample ID: 2017-06-05-2
TL Number from the TL Form:
Sample Submitted By Organization: CT - Unassigned/General Field Laboratory
Sample Organization Contact: 5625005861
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 06/05/2017
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 10 lots
A brief description of the sample: Resistance welded hoops
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding
Material Information
Production or Authorization Testing: Authorization Testing
Service or Ultimate: Service
Rebar Heat Number(s): 65025256
Hoop Manufacturer Lot Number(s): 96, 101
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 6
Diameter of Hoop: 2'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results
Test 1 of 6
DIME Test ID: 2017-06-05-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 96 | #6/19mm | 0.44 | 42740 | 97140 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 2 of 6
DIME Test ID: 2017-06-05-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 96 | #6/19mm | 0.44 | 42690 | 97020 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 3 of 6
DIME Test ID: 2017-06-05-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 96 | #6/19mm | 0.44 | 42910 | 97520 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 4 of 6
DIME Test ID: 2017-06-05-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 101 | #6/19mm | 0.44 | 42670 | 96980 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 5 of 6
DIME Test ID: 2017-06-05-2-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 101 | #6/19mm | 0.44 | 42630 | 96890 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 6 of 6
DIME Test ID: 2017-06-05-2-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 101 | #6/19mm | 0.44 | 42750 | 97160 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|