Project Information

Project ID: 215425 DEA: 06360244 EFIS: 0613000005 QA Service Level: 1
DIST-CO-RTE-PM: 06-TUL-99-30.6/35.2
Work Description: Widen Freeway & Bridge Construction (Concrete Bridge)
Location Description:
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVE, SYLMAR, CA, 91342
Resident Engineer: Javier Huerta Structure Rep.: Ramandeep Guraya

Sample Information

DIME Sample ID: 2025-01-21-5
TL Number from the TL Form:
Sample Submitted By Organization: CT D06 - Fresno Construction Field Office
Sample Organization Contact: (559) 243-3828
Type of Sample: Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 01/21/2025
Date that the sample was received by the laboratory/organization performing the testing: 01/21/2025
The quantity of what the sample constitutes: Multiple Lanes
A brief description of the sample: Skid Testing Request
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier: 46-0279
Structure name: J Street Overcrossing
The fabricator/manufacturer/facility name: Security Paving Inc

Material Information

Pavement Surface Type: PCC (Portland Cement Concrete)
Type of Traffic Control Provided: Behind K-Rail/Barrier
DIST-CO-RTE: 06-TUL-99
Direction of Travel: East
Post Mile: 33.22
Lanes to be Tested: Shoulder,Lane #1,Lane #2,Lane #3,Lane #4
Station:

Test Results

Test 1 of 5

DIME Test ID: 2025-01-21-5-2
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 02/10/2025
Date Tested: 02/07/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: J Street Overcrossing
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.29

Test 2 of 5

DIME Test ID: 2025-01-21-5-3
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 02/10/2025
Date Tested: 02/07/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.27

Test 3 of 5

DIME Test ID: 2025-01-21-5-4
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/01/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.36

Test 4 of 5

DIME Test ID: 2025-01-21-5-5
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/01/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.27

Test 5 of 5

DIME Test ID: 2025-01-21-5-6
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/03/2025
Date Tested: 04/02/2025
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.28

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2025-01-21-5-1CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)01/21/202501/24/2025Ramandeep GurayaCT HQ - FFS - Field Investigation Team (FIT)2-way traffic on the bridge. 8-foot shoulder and 2 12-foot lanes each way. if you have any questions, please give me a call at 559-349-0447. Thanks