Project Information

Project ID: 994582 DEA: 073203U4 EFIS: 0722000071 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-91,605-R16.6/R16.8,R0.0/R10.4
Work Description: PLACE CONCRETE PAVEMENT AND HIGH FRICTION SURFACE TREATMENT.
Location Description: LOS ANGELES COUNTY ON ROUTE 605 FROM 0.2 MILE NORTH OF KATELLA AVENUE UNDECROSSING TO 0.1 MILE NORTH OF TELEGRAPH ROAD UNDERCROSSING AND ON ROUTE 91 FROM 0.4 MILE WEST OF ROUTE 605 UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 605 UNDERCROSSING
Contractor Name: RASMUSSEN/VANGUARD
Contractor Address: 28548 LIVINGSTON AVENUE, VALENCIA CA 91335
Resident Engineer: Martin Oregel Structure Rep.: Tien Chu

Sample Information

DIME Sample ID: 2024-12-14-8
TL Number from the TL Form:
Sample Submitted By Organization: Alta Vista Solutions - Whittier
Sample Organization Contact: (510) 542-9827
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 12/14/2024
Date that the sample was received by the laboratory/organization performing the testing: 12/14/2024
The quantity of what the sample constitutes: 10 CY
A brief description of the sample: 3 - 6X6X21 Rapid Set Concrete Beams
From where was the sample collected: Job Site
Laboratory sample identification: 24-3876
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: N/A

Material Information

The concrete mix design number: HE4X12BM
The truck number from where the sample was collected: Truck 82
The batch plant ticket number from where the sample was collected: Load 1
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Jobsite
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 1

DIME Test ID: 2024-12-14-8-1
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Verified Date: 01/08/2025
Date Tested: 01/08/2025
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Number of specimens 3
Does the testing machine measure load or stress on the beam specimen? Stress
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Fracture occurred at a capped section No
Is a beam dimensional correction factor used? Yes
Age of specimen 10 days
Modulus of rupture 840 psi
Modulus of rupture average 840 psi
Modulus of rupture 2 850 psi
Modulus of rupture 3 830 psi