Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1000178 DEA: 051P7304 EFIS: 0522000101
QA Service Level: 1
DIST-CO-RTE-PM: 05-SCR-9-7.5/10.2
Work Description: COLD PLANE AC PAVEMENT, PLACE RHMA-G, AND RECONSTRUCT CURB RAMPS.
Location Description: SANTA CRUZ COUNTY IN AND NEAR BEN LOMOND FROM 0.1 MILE NORTH OF LAZY WOODS ROAD TO 0.1 MILE NORTH OF CALIFORNIA DRIVE
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 715 COMSTOCK STREET, SANTA CLARA, CA 95054
Resident Engineer: Ian Nguyen Structure Rep.: Unknown
DIME Sample ID: 2024-12-04-49
TL Number from the TL Form: 00000
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Verification
Type of Material: Asphaltic Emulsion
Sample Taken Date: 12/04/2024
Date that the sample was received by the laboratory/organization performing the testing: 12/12/2024
The quantity of what the sample constitutes: 1 Can
A brief description of the sample: SS1
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite
DIME Test ID: 2024-12-04-49-1
Test Method: AASHTO T59-22: Standard Method of Test for Emulsified Asphalts (Viscosity (Saybolt Furol) (Sec. 9))
Verified Date: 02/12/2025
Date Tested: 12/20/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Test at 25C. Information Only-sample was tested beyond 14 days. Test result complies with specification.
Test Result Compliance:
Additional Comments When Verified:
|
Efflux time (ET) for test sample
|
47 sec
|
|
Corrected efflux time as the Saybolt Furol viscosity (Corrected V)
|
47 sec
|
|
Test efflux temperature
|
77 F
|
DIME Test ID: 2024-12-04-49-3
Test Method: AASHTO T59-22: Standard Method of Test for Emulsified Asphalts (Storage Stability of Emulsified (Sec. 18))
Verified Date: 02/12/2025
Date Tested: 12/20/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Information Only-sample was tested beyond 14 days. Test result complies with specification.
Test Result Compliance:
Additional Comments When Verified:
|
Percent residue from the bottom portion of the sample
|
56 %
|
|
Percent residue from the top portion of the sample
|
57 %
|
|
Storage stability
|
1 %
|
DIME Test ID: 2024-12-04-49-5
Test Method: AASHTO T59-22: Standard Method of Test for Emulsified Asphalts (Emulsified Asphalt Residue Evap. (Sec. 7))
Verified Date: 02/12/2025
Date Tested: 12/20/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Information Only-sample was tested beyond 14 days. Test result complies with specification.
Test Result Compliance:
Additional Comments When Verified:
|
How many beakers will be used to conduct the test?
|
2
|
|
Beaker 1 Residue
|
62.2 %
|
|
Beaker 2 Residue
|
64.6 %
|
|
Percentage of residue
|
63 %
|
DIME Test ID: 2024-12-04-49-6
Test Method: AASHTO T49-22: Standard Method of Test for Penetration of Bituminous Materials
Verified Date: 02/12/2025
Date Tested: 12/20/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: 25 C. Information Only-sample was tested beyond 14 days. Recommend RE to confirm material type of SS-1 emulsion for compliance.
Test Result Compliance:
Additional Comments When Verified:
|
Average Penetration
|
115 dmm
|
DIME Test ID: 2024-12-04-49-7
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphaltic Emulsion)
Verified Date: 02/12/2025
Date Tested: 12/20/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Information Only-sample was tested beyond 14 days. Test result complies with specification.
Test Result Compliance:
Additional Comments When Verified:
|
Is a normal test obtainable?
|
Yes
|
|
Number of replicates tested
|
One
|
|
Was test performed on residue from distillation or evaporation?
|
Evaporation
|
|
Ductility of test #1 (D1)
|
430 mm
|
|
Ductility of sample
|
430 mm
|
DIME Test ID: 2024-12-04-49-8
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 02/12/2025
Date Tested: 12/20/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Information Only-sample was tested beyond 14 days. Test result complies with specification.
Test Result Compliance:
Additional Comments When Verified:
|
Was test performed on residue from distillation or evaporation?
|
Evaporation
|
|
Soluble, percent
|
99.6 %
|
|
Insoluble, percent
|
0.4 %
|