Sample Record for 2024-09-27-83
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 214649 DEA: 07316004 EFIS: 0715000194
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-14-60.70
Work Description: REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES.
Location Description: ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE.
Contractor Name: Guy F. Atkinson Construction LLC
Contractor Address: 18201 Von Karman Ave, Suite 800, Irvine, CA 92612
Resident Engineer: James Shih Structure Rep.: Hossein Sabbagh
Sample Information
DIME Sample ID: 2024-09-27-83
TL Number from the TL Form:
Sample Submitted By Organization: Alta Vista Solutions - Whittier
Sample Organization Contact: (510) 542-9827
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 09/27/2024
Date that the sample was received by the laboratory/organization performing the testing: 09/27/2024
The quantity of what the sample constitutes: 10 cubic yards
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification: 24-2991
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: N/A
Material Information
The concrete mix design number: SCI-12622-3
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 8
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: wheelbarrow
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
Test Results
Test 1 of 1
DIME Test ID: 2024-09-27-83-1
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 11/13/2024
Date Tested: 11/08/2024
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
|
Unit system used?
|
US Units
|
|
Number of specimens
|
3
|
|
Test performed
|
With no density determined
|
|
Capped in accordance with?
|
ASTM C1231 - Unbonded Elastomeric Pad Cap
|
|
Average diameter of cylinder 1
|
5.95 in
|
|
Average diameter of cylinder 2
|
5.95 in
|
|
Average diameter of cylinder 3
|
5.95 in
|
|
Cross sectional area of cylinder 1
|
27.81 in^2
|
|
Cross sectional area of cylinder 2
|
27.81 in^2
|
|
Cross sectional area of cylinder 3
|
27.81 in^2
|
|
Compressive strength (to nearest 10 psi)
|
6860 psi
|
|
Maximum load on cylinder 1
|
193768 lb
|
|
Maximum load on cylinder 2
|
184182 lb
|
|
Maximum load on cylinder 3
|
194285 lb
|
|
Compressive strength of cylinder 1
|
6967.6 psi
|
|
Type of fracture pattern of cylinder 1
|
3
|
|
Compressive strength of cylinder 2
|
6622.9 psi
|
|
Compressive strength of cylinder 3
|
6986.2 psi
|
|
Type of fracture pattern of cylinder 2
|
3
|
|
Type of fracture pattern of cylinder 3
|
3
|
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
|
Correction factor for cylinder 1
|
1
|
|
Correction factor for cylinder 2
|
1
|
|
Correction factor for cylinder 3
|
1
|
|
Age of specimen
|
42 days
|
|
Age of specimen in hours
|
no data0 hours
|