Print Report | Back to Sample Detail

Sample Record for 2024-10-02-112

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-55,55-29.6,R6.4/10.3
Work Description: CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location Description: ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 Townsgate Road, Suite 200, Westlake Village, CA 91361
Resident Engineer: Adrian Wu Structure Rep.: Jason Kim

Sample Information

DIME Sample ID: 2024-10-02-112
TL Number from the TL Form: Unknown
Sample Submitted By Organization: G3 Quality, Incorporated - Cerritos
Sample Organization Contact: (562) 321-9840
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 10/02/2024
Date that the sample was received by the laboratory/organization performing the testing: 10/03/2024
The quantity of what the sample constitutes: 4
A brief description of the sample: 6X12 Concrete Cylinders
From where was the sample collected: Job Site
Laboratory sample identification: Mix S85C440T18, Set 1
Structure unique identifier: 00-0000
Structure name:
The fabricator/manufacturer/facility name: National Ready Mix

Material Information

The concrete mix design number: S85C440T18
The truck number from where the sample was collected: Load 1
The batch plant ticket number from where the sample was collected: 0
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Set 1
A detailed description of where the material sample was collected: Edinger, Bent 4, Footing
Where the material sample would have been placed if not sampled: Unknown
From Lot No.: 1
Bag Lot No.: 1

Test Results

Test 1 of 5

DIME Test ID: 2024-10-02-112-1
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 10/30/2024
Date Tested: 10/30/2024
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 2
Test performed With no density determined
Capped in accordance with? ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1 6.01 in
Average diameter of cylinder 2 6.01 in
Cross sectional area of cylinder 1 28.37 in^2
Cross sectional area of cylinder 2 28.37 in^2
Compressive strength (to nearest 10 psi) 6370 psi
Maximum load on cylinder 1 174115 lb
Maximum load on cylinder 2 186878 lb
Type of fracture pattern of cylinder 1 2
Type of fracture pattern of cylinder 2 2
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Age of specimen 28 days
Age of specimen in hours no data0 hours

Test 2 of 5

DIME Test ID: 2024-10-02-112-2
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Verified Date: 10/30/2024
Date Tested: 10/02/2024
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Temperature 87 F

Test 3 of 5

DIME Test ID: 2024-10-02-112-3
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Verified Date: 10/30/2024
Date Tested: 10/02/2024
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit weight of the concrete 145.9 lb/ft^3
Cement content no data0 lb/yd^3

Test 4 of 5

DIME Test ID: 2024-10-02-112-4
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 10/30/2024
Date Tested: 10/02/2024
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Air Content 1.2 %

Test 5 of 5

DIME Test ID: 2024-10-02-112-5
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Verified Date: 10/30/2024
Date Tested: 10/02/2024
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Slump 5 inch