Print Report | Back to Sample Detail

Sample Record for 2024-10-18-21

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1000231 DEA: 081N6504 EFIS: 0823000029 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-62-38.5/48.5
Work Description: RHMA-G, PARTIAL DEPTH RECYCLING, AND SHOULDER BACKING.
Location Description: SAN BERNARDINO COUNTY NEAR TWENTYNINE PALMS FROM GOPHER GROVE LANE TO GOLD CROWN ROAD
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: Unknown
Resident Engineer: Francisco Montellano Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2024-10-18-21
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Production Start-Up
Type of Material: Hot Mix Asphalt
Sample Taken Date: 10/18/2024
Date that the sample was received by the laboratory/organization performing the testing: 10/24/2024
The quantity of what the sample constitutes: 4 boxes of rhma
A brief description of the sample: 1/2" RHMA-G-SP .5% LAS
From where was the sample collected: Manufacturer
Laboratory sample identification: 0579G-24
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Desert Hot Springs

Material Information

HMA Type: RHMA-G
HMA Grading: 1/2 inch
Lot number:
Sublot number:
HMA Mix Number: 1346
Binder content (%):
Virgin binder PG:
Design binder PG:
Binder Supplier:
RAP content (%):
WMA Additives:
Antistrip type:

Test Results