Sample Record for 2024-09-11-76
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 995286 DEA: 042Q5704 EFIS: 0419000026
QA Service Level: 1
DIST-CO-RTE-PM: 04-SCL-101,680-Var
Work Description: REPLACE STORMWATER PUMPS AND CONSTRUCT DRAINAGE BOXES.
Location Description: SANTA CLARA COUNTY IN AND NEAR MORGAN HILL AND SAN JOSE AT VARIOUS LOCATIONS
Contractor Name: DISNEY CONSTRUCTION, INC.
Contractor Address: 533 airport Blvd, Suite 120, Burlingame, CA 94010
Resident Engineer: Nim Patel Structure Rep.: Steve Gong
Sample Information
DIME Sample ID: 2024-09-11-76
TL Number from the TL Form:
Sample Submitted By Organization: Structure Cast
Sample Organization Contact: (661) 301-2624
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 09/11/2024
Date that the sample was received by the laboratory/organization performing the testing: 09/11/2024
The quantity of what the sample constitutes: 40cy
A brief description of the sample: C1611
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: StructureCast
Material Information
The concrete mix design number: 8.5SK SCC
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 16361
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Precast Plant
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
Test Results
Test 1 of 1
DIME Test ID: 2024-09-11-76-1
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Verified Date: 10/05/2024
Date Tested: 09/11/2024
Submitted By Organization: Structure Cast
Organization Address: 8261 McCutchen Road ,
Organization City: Bakersfield
Organization State: CA
Organization Zipcode: 93311
Organization Email: brent@structurecast.com
Organization Phone: (661) 717-5464
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
|
What unit system is used for measurements?
|
inches
|
|
Slump Flow
|
26 in
|
|
Filling the mold procedure
|
Filling Procedure B (Inverted Mold)
|
|
Diameter 1
|
26 in
|
|
Diameter 2
|
26 in
|
|
Visual Stability Index
|
no data0
|