Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 215741 DEA: 01366004 EFIS: 0100000127
QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-101-80.0/84.0
Work Description: Indianola Cutoff UC
Location Description: HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF
Contractor Name: Granite Construction Company
Contractor Address: 1324 S. State Street, Ukiah, CA 95482
Resident Engineer: Efren Banuelos Structure Rep.: Adlai Evans
DIME Sample ID: 2024-09-25-72
TL Number from the TL Form: 00000
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 09/25/2024
Date that the sample was received by the laboratory/organization performing the testing: 10/01/2024
The quantity of what the sample constitutes: 1 OF 1
A brief description of the sample: PG 64-16
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: GRANITE
Performance Grade: PG 64-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier: Granite/Kernan
Certified Asphalt Supplier: Valero Marketing & Supply - Benicia CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2024-09-25-72-1
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/03/2024
Date Tested: 10/03/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: og
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
Original binder
|
|
Test Gap
|
1 mm
|
|
Test Frequency
|
10.0 rad/s
|
|
Strain Amplitude
|
12.00 %
|
|
Stress Amplitude
|
0.168 kPa
|
|
Phase Angle (δ) (for the 10 cycles)
|
87.3 degree
|
|
Complex Modulus (G*) (for the 10 measurements)
|
1.391 kPa
|
|
Test Temperature (Specimen 1)
|
64.0 C
|
|
Dynamic Shear, G*/sin(δ)
|
1.39 kPa
|
DIME Test ID: 2024-09-25-72-2
Test Method: AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/03/2024
Date Tested: 10/03/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: rtfo
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
RTFO residue
|
|
Test Gap
|
1 mm
|
|
Test Frequency
|
10.0 rad/s
|
|
Strain Amplitude
|
10.00 %
|
|
Stress Amplitude
|
0.320 kPa
|
|
Phase Angle (δ) (for the 10 cycles)
|
84.0 degree
|
|
Complex Modulus (G*) (for the 10 measurements)
|
3.180 kPa
|
|
Test Temperature (Specimen 1)
|
64.0 C
|
|
Dynamic Shear, G*/sin(δ)
|
3.20 kPa
|
DIME Test ID: 2024-09-25-72-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 10/03/2024
Date Tested: 10/03/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is a normal test obtainable?
|
Yes
|
|
Number of replicates tested
|
One
|
|
Ductility of test #1 (D1)
|
150 cm
|
|
Ductility of sample
|
150 cm
|