Print Report | Back to Sample Detail

Sample Record for 2024-09-25-52

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994857 DEA: 010H6104 EFIS: 0117000241 QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-36-13.5/R36.1
Work Description: COLD PLANE AND OVERLAY HMA, & REPLACE GUARDRAILS.
Location Description: HUMBOLDT COUNTY AT AND NEAR BRIDGEVILLE FROM 3.4 MILES WEST OF GRIZZLY CREEK BRIDGE TO 0.8 MILE EAST OF SOUTH FORK VAN DUZEN RIVER
Contractor Name: MERCER FRASER COMPANY
Contractor Address: PO Box 1006, Eureka, CA 95502
Resident Engineer: Joaquin Rodriquez Structure Rep.: Shantanu Nalawade

Sample Information

DIME Sample ID: 2024-09-25-52
TL Number from the TL Form: 606912
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Rubber Binder
Sample Taken Date: 09/25/2024
Date that the sample was received by the laboratory/organization performing the testing: 09/27/2024
The quantity of what the sample constitutes: 1 of 1
A brief description of the sample: RHMA
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: FORTUNA

Material Information

Asphalt modifier supplier:
Performance Grade: PG 64-16
Lot number:
Sublot number:
Asphalt Rubber Binder Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2024-09-25-52-1
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Verified Date: 10/01/2024
Date Tested: 09/30/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Determination Unworked Penetration
Unworked Penetration 42 0.1 mm

Test 2 of 3

DIME Test ID: 2024-09-25-52-2
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Verified Date: 10/01/2024
Date Tested: 09/30/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
ASTM Thermometer used? C
Softening Point Sample 1 66 C
Softening Point Sample 2 66 C
Bath Liquid freshly boiled distilled water
Minutes Reaction no data

Test 3 of 3

DIME Test ID: 2024-09-25-52-3
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Verified Date: 10/01/2024
Date Tested: 09/30/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 25 C
Ball Penetration (P1) no data0 mm
Final Dial reading (F1) 61 mm
Ball Penetration (P2) 2 mm
Final Dial reading (F2) 69 mm
Ball Penetration (P3) 2 mm
Final Dial reading (F3) 70 mm
Resilience 1 39 %
Resilience 2 33 %
Resilience 3 32 %
Average Resilience 35 %
Minutes Reaction no data