Project Personnel
This page displays personnel associated with project DIME:795.Project Information
Project Information
Project Identifiers | Project ID: 795 Permit Numbers: 0309NSN0737 0309NRD0993 |
---|---|
DIST-CO-RTE-PM | 03-SAC-50-15.81/15.812 |
Award Date | 09/11/2009 |
Closeout Date | 09/17/2014 |
Work Description | U.S. 50 on ramp (WB) will be widened approximately three feet to the east. The existing pavement on Hazel Avenue will be overlaid with 2" ARHM-GG. The maximum excavation depth (30.5") will occur on the SW shoulder between station 59+33.28 to 63+42.64. Along with the widening, curb, gutter |
Location Description | Hazel, Sacramento |
QA Service Level | NOT VERIFIED |
Caltrans Internal Project Database Personnel
Personnel stored in Caltrans' internal project databases are not editable in DIME. If any of the project personnel information below is incorrect or missing, please contact the project METS REP(s).
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
DIME Project Personnel
You must be logged in to view DIME project personnel.