Project Personnel
This page displays personnel associated with project DEA: 04445604.Project Information
Project Information
Project Identifiers | Project ID: 7475 DEA: 04445604 EFIS: 0400001081 COOP: 042434 Permit Numbers: 0412NMC0872 0412NDP1643 |
---|---|
DIST-CO-RTE-PM | 04-SCL-280-5.1/5.2,0.0/0.8 |
Award Date | Not set |
Closeout Date | 05/07/2019 |
Work Description | The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, widening |
Location Description | In San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing |
QA Service Level | 2 (Verified on 12/11/2012) |
Caltrans Internal Project Database Personnel
Personnel stored in Caltrans' internal project databases are not editable in DIME. If any of the project personnel information below is incorrect or missing, please contact the project METS REP(s).
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
minh.hinh@dot.ca.gov | Minh Hinh | Resident Engineer | Caltrans RE DB |
Brian.Wiedmann@hatchmott.com | Brian Wiedmann | Oversight Resident Engineer | Caltrans REO DB |
ali_kamalvand@dot.ca.gov | Ali Kamalvand | Structural Representative | Caltrans SR DB |
Ismael.Ramirez@vta.org | Ismael Ramirez | Oversight Structural Representative | Caltrans SRO DB |
DIME Project Personnel
You must be logged in to view DIME project personnel.