Project Personnel
This page displays personnel associated with project DEA: 041637U3.Project Information
Project Information
Project Identifiers | Project ID: 6928 DEA: 041637U3 EFIS: 0400020166 |
---|---|
DIST-CO-RTE-PM | 04-SF-101-8.2/9.8, 6.9/7.1 |
Award Date | Not set |
Closeout Date | 07/12/2019 |
Work Description | P3 project, Doyle Drive Phase 2, Remaining elements of Presidio Parkway, including NB Presidio Viaduct and Battery Tunnel, Main Post Tunnels, and new Girard Road Interchange w/direct connection to the Presidio. |
Location Description | San Francisco Presidio, Southern approach to Golden Gate Bridge |
QA Service Level | 2 (Verified on 02/07/2013) |
Caltrans Internal Project Database Personnel
Personnel stored in Caltrans' internal project databases are not editable in DIME. If any of the project personnel information below is incorrect or missing, please contact the project METS REP(s).
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
john.f.walters@dot.ca.gov | John Walters | Structural Representative | Caltrans SR DB |
DIME Project Personnel
You must be logged in to view DIME project personnel.