Project Personnel
This page displays personnel associated with project DIME:214783.Project Information
Project Information
Project Identifiers | Project ID: 214783 Permit Numbers: 1119NUR0675 1119NRW0703 1119NRW0891 1120NRT0116 |
---|---|
DIST-CO-RTE-PM | 11-IMP-8-36.5/37.5 |
Award Date | 07/01/2019 |
Closeout Date | 08/24/2021 |
Work Description | enter upon State Highway right of way in Imperial County, City of El Centro, on Interstate 8, post mile R36.50 to R37.50, to replace existing 18-inch diameter steel water pipeline with new PVC water pipeline and extension of storm drain pipeline to IID structure by Horizontal Directional Drilling |
Location Description | INTERSTATE 8, EL CENTRO |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Internal Project Database Personnel
Personnel stored in Caltrans' internal project databases are not editable in DIME. If any of the project personnel information below is incorrect or missing, please contact the project METS REP(s).
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
daniel.hernandez.duarte@dot.ca.gov | Daniel Hernandez-Duarte | Resident Engineer | Caltrans RE DB |
manuel.plancarte@dot.ca.gov | Manuel Plancarte | Structural Representative | Caltrans SR DB |
venkatesh.iyer@dot.ca.gov | Venkatesh Iyer | METS REP | Caltrans METS REP DB |