Project Personnel
This page displays personnel associated with project DEA: 032F21U3.Project Information
Project Information
Project Identifiers | Project ID: 209284 DEA: 032F21U3 EFIS: 0313000172 COOP: 03130001724 |
---|---|
DIST-CO-RTE-PM | 03-SAC-50-2.5/0.6 |
Award Date | 12/20/2013 |
Closeout Date | 03/22/2016 |
Work Description | NOTIFY SMR BEFORE RESPONDING TO ANY REQUESTS FOR INSPECTION OR TESTING.The Design Build project will place overlay, replace bridge joint seals and/or joint seal assemblies, and correct drainage issues on Sacramento River Viaduct and West End Viaduct. |
Location Description | US Route 50 from PM 2.5 in Yolo County through PM 0.6 in Sacramento County; Route I-5 from |
QA Service Level | 1 (Verified on 01/16/2014) |
Caltrans Internal Project Database Personnel
Personnel stored in Caltrans' internal project databases are not editable in DIME. If any of the project personnel information below is incorrect or missing, please contact the project METS REP(s).
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
bojana.gutierrez@dot.ca.gov | Bojana Gutierrez | Resident Engineer | Caltrans RE DB |
rodel.padre@dot.ca.gov | Rodel Padre | Structural Representative | Caltrans SR DB |
DIME Project Personnel
You must be logged in to view DIME project personnel.