Project Personnel
This page displays personnel associated with project DEA: 040A0814.Project Information
Project Information
Project Identifiers | Project ID: 208946 DEA: 040A0814 EFIS: 0413000365 COOP: 042502 Permit Numbers: 0415NMC0806 |
---|---|
DIST-CO-RTE-PM | 04-CC--3.8/5.3 |
Award Date | 04/23/2015 |
Closeout Date | 07/12/2019 |
Work Description | Reconstruct El Portal Drive WB on-ramp, (b) extending auxiliary lanes along I-80 WB between new El Portal Dr. WB on-ramp to San Pablo Dam Rd. WB off-ramp, (c) realigning El Portal, (d) sliver widening on EB 80 mainline and (e) reconstruct median barrier |
Location Description | San Pablo Dam Road |
QA Service Level | 2 (Verified on 12/18/2015) |
Caltrans Internal Project Database Personnel
Personnel stored in Caltrans' internal project databases are not editable in DIME. If any of the project personnel information below is incorrect or missing, please contact the project METS REP(s).
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Nick@hannagrp.com | Nick Panayotou | Oversight Resident Engineer | Caltrans REO DB |
DIME Project Personnel
You must be logged in to view DIME project personnel.