Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16811-16820 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
995360 | Project ID: 995360 DEA: 051Q9304 EFIS: 0523000103 | 05-SCR/SCR-9-17/19 | Clear downed or hazardous trees, remove brush, and stabilize slopes | 10/28/2024 | 1 (10/10/2024) | Details CEM-3701 Report | |
995361 | Project ID: 995361 DEA: 072XF604 EFIS: 0723000126 | 07-VEN-33-24.25/27.3 | Rebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW | 1 (11/27/2023) | Details CEM-3701 Report | ||
995362 | Project ID: 995362 DEA: 043Y1604 EFIS: 0423000203 | 04-SON-128-15.98/16.55 | Repair slope embankment damage to roadway due to slide, restore drainage function, and install rock slope protection, soldier pile, and rock stabilization (DTWM - Anchored) to stabilize adjacent slope. Construct 120 foot long segmented soldier pile wall with pile cap. Max height of the wall is 7 fee | 1 (04/12/2024) | Details CEM-3701 Report | ||
995363 | Project ID: 995363 DEA: 11431834 EFIS: 1123000171 | 11-SD-52-8.300000000000001/8.300000000000001 | Provide traffic control, clean, inspect, and prepare culverts, CIPP line culverts, import borrow and repair embankment, install rock slope protection, install 24\" RCP, invert pave existing culverts, landscape embankment, install erosion | 1 (06/11/2024) | Details CEM-3701 Report | ||
995364 | Project ID: 995364 DEA: 051Q9404 EFIS: 0523000104 | 05-SCR-1-33/33 | Restore slope | 1 (11/16/2023) | Details CEM-3701 Report | ||
995365 | Project ID: 995365 DEA: 034J5804 EFIS: 0323000209 | 03-YOL--2.2/2.7 | Site preparation, reset guardrail, debris removal, backfill, HMA Dike, concrete vegetation control, erosion control, traffic control, and incidental work | 1 (11/13/2023) | Details CEM-3701 Report | ||
995366 | Project ID: 995366 DEA: 043Y0404 EFIS: 0423000191 | 04-SON-12,37,116,121,116-Var/Var | Repair Storm Damaged Pavement | 1 (04/12/2024) | Details CEM-3701 Report | ||
995367 | Project ID: 995367 DEA: 051Q8604 EFIS: 0523000081 | 05-SLO-101-5714/5714 | Repair flood damage to the building | 1 (11/16/2023) | Details CEM-3701 Report | ||
995368 | Project ID: 995368 DEA: 010M9404 EFIS: 0123000097 | 01-HUM-254-7/8 | Stabilized Embankment | 11/20/2023 | 1 (11/16/2023) | Details CEM-3701 Report | |
995369 | Project ID: 995369 DEA: 043Y3404 EFIS: 0423000224 | 04-SM/SM-280-8.800000000000001/8.800000000000001 | Traffic control, remove and replace existing drainage systems, excavate roadway and repave pavement, erosion control | 03/11/2024 | NOT VERIFIED | Details CEM-3701 Report |