Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 221-230 of 17616 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
187 | Project ID: 187 DEA: 01471404 | 01-HUM-101-49.19/19.52 | REPAIR SIDESLOPE & CULVERT | 04/09/2013 | 1 (08/10/2006) | Details CEM-3701 Report | |
188 | Project ID: 188 DEA: 01471804 EFIS: 0100000307 MINOR: 01A1034 | 01-HUM-255-4.74 | REMOVE AND REPLACE CULVERT AND INSTALL A HEADWALL | 01/24/2013 | 1 (01/24/2013) | Details CEM-3701 Report | |
189 | Project ID: 189 DEA: 01472004 | 01-LAK-29,281-27.9,17.0 | INSTALL SIGNAL SYSTEM | 03/11/2011 | 1 (06/22/2007) | Details CEM-3701 Report | |
190 | Project ID: 190 DEA: 01472104 COOP: 010397 | 01-HUM-299-R21.5 | Soldier Pile Tie Back Wall | In Humboldt County on Route 299 | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
191 | Project ID: 191 DEA: 01472204 | 01-HUM-96-3.0,7.4/7.6 | RECONSTRUCT ROADWAY, REPAIR SLOPE AND DRAINAGE | HUMBOLDT COUNTY NEAR WILLOW CREEK AT 2.3 MILES NORTH OF PG&E SERVICE CENTER ROAD AND FROM 0.9 MILE TO 0.6 MILE SOUTH OF TISH TANG SIDEHILL VIADUCT #1 | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
192 | Project ID: 192 DEA: 01472304 | 01-HUM-96-26.9/R41.1 | RECONSTRUCT ROADWAY WITH HMA OVER CL2 AB AND INSTALL DRAINAGE SYSTEM. | HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.7 MILE WEST OF BLUFF CREEK ROAD TO 4.0 MILES WEST OF THE HUMBOLDT/SISKIYOU COUNTY LINE | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
193 | Project ID: 193 DEA: 01472404 | 01-HUM-96-23.0/23.9 | Repair Roadway And Install Gallery Drainage Walls | In Humboldt County on Route 96 | 03/11/2011 | 1 (12/07/2009) | Details CEM-3701 Report |
194 | Project ID: 194 DEA: 01472604 | 01-MEN-1-82.1/82.3 | Repair Storm Damage. | MENDOCINO COUNTY NEAR WESTPORT FROM 1.4 MILES NORTH OF HOWARD CREEK BRIDGE TO 0.6 MILE SOUTH OF JUAN CREEK BRIDGE | 02/10/2012 | 1 (04/28/2011) | Details CEM-3701 Report |
195 | Project ID: 195 DEA: 01472804 | 01-MEN-1-95.2/102.4 | REPAIR SLOPES WITH GEOSYNTHETIC REINFORCEMENT | In Mendocino County on Route 1 | 04/26/2011 | 1 (04/26/2011) | Details CEM-3701 Report |
196 | Project ID: 196 DEA: 01472904 | 01-MEN-1-74.7/75.9 | COLD PLANE AC, PLACE HMA AND DRAINAGE STRUCTURES. | MENDOCINO COUNTY NEAR WESTPORT AT 1.1 MILES SOUTH AND AT 1.7 MILES NORTH OF BLUE SLIDE GULCH VIADUCT | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |