Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17861-17870 of 18023 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215242 | Project ID: 215242 DEA: 060H3604 EFIS: 0600000935 COOP: 061720 | 06-FRE-99-28.1/30.9 | Veterans Blvd project includes 6-lane arterial roadway in NW Fresno, freeway interchange at SR-99; grade separations over the Union Pacific Railroad, HSR line & Golden State Blvd & multi-purpose trail & adaptive intelligent transportation system tech. | SR 99 & Veterans Blvd Interchange Alignment between W Hendon Ave to W Shaw Ave | 2 (10/15/2020) | Details CEM-3701 Report | |
215328 | Project ID: 215328 DEA: 07217204 EFIS: 0713000315 COOP: 075178 | 07-LA-1-15.9 to 16.2 | The project will widen the intersection of PCH and Hawthorne Blvd to provide three through lanes, dual left-turn lanes and a right-turn lane on all approaches. intersection improvements including construction of jointed plain concrete, new appurtenances including curb, gutter, sidewalk, curb ramps, | City of Torrance in Los Angeles County (Caltrans district 7). On Route 1 (Pacific Coast Highway) from Post Mile (PM) 15.9 to PM 16.2 which corresponds to approximately 220' west of Neece Ave. to 242nd Street | 2 (01/04/2021) | Details CEM-3701 Report | |
215335 | Project ID: 215335 DEA: 07220504 EFIS: 0700020076 COOP: 072044A1 | 07-LA-Route 1-23.7/23.9 | Sepulveda Bridge Widening Project | SEPULVEDA BRIDGE WIDENING ON STATE ROUTE 1 FROM 33RD STREET TO ROSECRANS AVENUE | 2 (11/18/2020) | Details CEM-3701 Report | |
215401 | Project ID: 215401 DEA: 040Q3004 EFIS: 0418000069 COOP: 042776 | 04-ALA-680-R10.6/R21.9 | I-680 Southbound express lanes and rehabilitation | I- 680 Southbound from State Route (SR) 84 to Alcosta Boulevard in Alameda County | 09/01/2022 | 2 (01/25/2021) | Details CEM-3701 Report |
215440 | Project ID: 215440 Permit Numbers: 1017NMC0420 1019NRT0306 | 10---28 | Realigned the south approach to the intersection of Hickman Road and State Highway 132 due to the bridge replacement project along Hickman Road over the Tuolumne River in the City of Waterford in Stanislaus County. Work inside the State right of way includes 0.125" cold plane asphalt concrete p | SR 132, City of Waterford | 03/03/2022 | 2 (06/04/2021) | Details CEM-3701 Report |
215462 | Project ID: 215462 DEA: 080C8704 EFIS: 0800000064 COOP: 081687 | 08-SBD-SR 60-R2.08/2.80 | The project scope of work is widening approximately .7 miles of SR-60 at Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions | Project Limits are SR-60 from 0.3 miles west to 0.4 miles east of Central Ave. PM 2.08/2.80 in Chino. | 2 (01/18/2021) | Details CEM-3701 Report | |
215481 | Project ID: 215481 DEA: 041W6904 EFIS: 0421000074 COOP: 042811 | 04-SCL-85-4.45/20.77 | Noise reduction and/or noise attenuation measures at five (5) locations | Along the State Route 85 (SR 85) corridor | 2 (03/12/2021) | Details CEM-3701 Report | |
215511 | Project ID: 215511 Permit Numbers: 0420NOP2444 | 04-SOL-80- | off-ramp intersection modifications | West Texas Street / I-80 Eastbound off-ramp | 2 (02/19/2021) | Details CEM-3701 Report | |
215563 | Project ID: 215563 Permit Numbers: 10196MC0162 | 10---30.828 | To widen Beckman Road by adding a continuous left turn lane. | SR 99, Lodi | 2 (05/10/2023) | Details CEM-3701 Report | |
215565 | Project ID: 215565 Permit Numbers: 0320AOP1078 | 03-ED-50-16.4/16.8 | The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of Placerville | N/A, Placerville | 2 (04/19/2021) | Details CEM-3701 Report |