Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17831-17840 of 18260 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
209740 | Project ID: 209740 DEA: 042243A2 COOP: 042243A2 | 04-ALA-- | 2 (09/16/2019) | Details CEM-3701 Report | |||
209746 | Project ID: 209746 COOP: 061540 | 06--- | 08/17/2021 | 2 (07/29/2021) | Details CEM-3701 Report | ||
209753 | Project ID: 209753 Permit Numbers: 0411NMC0671 0414NRW0590 04146DP1400 | 04-ALA-680-16.561/16.561 | Proposed project will include widening of the existing ramps at the rte 680/Bernal Avenue interchange in Pleasanton. Traffic signal modifications will be performed at two locations and widening will also be performed on Bernal Avenue. | Hwy 680 and Ramps, Pleasanton | 08/21/2018 | 2 (07/21/2014) | Details CEM-3701 Report |
209760 | Project ID: 209760 DEA: 040G2514 EFIS: 0400020535 COOP: 042463 | 04-SF-80,280- | NEW RAMPS & NEW TERMINAL TO RTE 80 BUS STORAGE FACILITY | I-80 AND THE FREMONT STREET OFFRAMP STRUCTURE | 01/04/2018 | 2 (08/11/2014) | Details CEM-3701 Report |
209779 | Project ID: 209779 DEA: 040G1904 EFIS: 0400000315 COOP: 042243A2 | 04-ALA-580-R7.8/19.1 | Convert HOV to HOT ( High Occupancy Toll lane or lanes | Along EB I-580 from east of the Greenville Overhead in Livermore to west of Hacienda Drive in Pleasanton | 01/09/2025 | 2 (09/09/2019) | Details CEM-3701 Report |
211847 | Project ID: 211847 DEA: 07224104 EFIS: 0700000357 | 07-LA-60-21.5R/23.0R | Construct Interchange -MAINLINE PAVEMENT REPAIR, PCC SLABSC HM1 (RIGID) PROGRAM | CITY OF INDUSTRY & DIAMOND BAR FROM FAIRWAY DR UC TO OLD BREA CYN RD UC | 04/26/2018 | 2 (04/25/2017) | Details CEM-3701 Report |
209780 | Project ID: 209780 DEA: 043A7904 EFIS: 0400020061 COOP: 042482A1 | 04-SOL-80-23.1 | Install New Traffic Signal | At Intersection of Lagoon Valley Road and the Interstate Route 80 | 2 (08/19/2019) | Details CEM-3701 Report | |
209783 | Project ID: 209783 DEA: 043G9104 EFIS: 0413000110 COOP: 042414A1 | 04-ALA-80,84,92-var | 01/08/2025 | 2 (09/16/2019) | Details CEM-3701 Report | ||
209823 | Project ID: 209823 DEA: 044H6104 EFIS: 0413000216 COOP: 042551 | 04-CC-680-R16.6/23.7,R18.8/23.2 | Conversion of Interstate 680 (I-680) High Occupancy Vehicle (HOV) Lanes to Express Lanes, | In the southbound direction from south of Marina Vista Road to Treat Boulevard and in the northbound direction from State Route 242 to Marina Vista Road | 05/18/2021 | 2 (02/17/2015) | Details CEM-3701 Report |
209843 | Project ID: 209843 DEA: 04290824 COOP: 042167A2 | 04-ALA-580-R8.3/R21.4 | Westbound HOV Lane | From east of the Greenville Road Interchange in Livermore to the San Ramon Road/ Foothill Road Interchange in Dublin within the jurisdiction of ACCMA. | 01/07/2025 | 2 (09/16/2019) | Details CEM-3701 Report |