Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17501-17510 of 17630 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215335 | Project ID: 215335 DEA: 07220504 EFIS: 0700020076 COOP: 072044A1 | 07-LA-Route 1-23.7/23.9 | Sepulveda Bridge Widening Project | SEPULVEDA BRIDGE WIDENING ON STATE ROUTE 1 FROM 33RD STREET TO ROSECRANS AVENUE | 2 (11/18/2020) | Details CEM-3701 Report | |
215401 | Project ID: 215401 DEA: 040Q3004 EFIS: 0418000069 COOP: 042776 | 04-ALA-680-R10.6/R21.9 | I-680 Southbound express lanes and rehabilitation | I- 680 Southbound from State Route (SR) 84 to Alcosta Boulevard in Alameda County | 09/01/2022 | 2 (01/25/2021) | Details CEM-3701 Report |
215440 | Project ID: 215440 Permit Numbers: 1017NMC0420 1019NRT0306 | 10---28 | Realigned the south approach to the intersection of Hickman Road and State Highway 132 due to the bridge replacement project along Hickman Road over the Tuolumne River in the City of Waterford in Stanislaus County. Work inside the State right of way includes 0.125" cold plane asphalt concrete p | SR 132, City of Waterford | 03/03/2022 | 2 (06/04/2021) | Details CEM-3701 Report |
215462 | Project ID: 215462 DEA: 080C8704 EFIS: 0800000064 COOP: 081687 | 08-SBD-SR 60-R2.08/2.80 | The project scope of work is widening approximately .7 miles of SR-60 at Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions | Project Limits are SR-60 from 0.3 miles west to 0.4 miles east of Central Ave. PM 2.08/2.80 in Chino. | 2 (01/18/2021) | Details CEM-3701 Report | |
215481 | Project ID: 215481 DEA: 041W6904 EFIS: 0421000074 COOP: 042811 | 04-SCL-85-4.45/20.77 | Noise reduction and/or noise attenuation measures at five (5) locations | Along the State Route 85 (SR 85) corridor | 2 (03/12/2021) | Details CEM-3701 Report | |
215511 | Project ID: 215511 Permit Numbers: 0420NOP2444 | 04-SOL-80- | off-ramp intersection modifications | West Texas Street / I-80 Eastbound off-ramp | 2 (02/19/2021) | Details CEM-3701 Report | |
215563 | Project ID: 215563 Permit Numbers: 10196MC0162 | 10---30.828 | To widen Beckman Road by adding a continuous left turn lane. | SR 99, Lodi | 2 (05/10/2023) | Details CEM-3701 Report | |
215565 | Project ID: 215565 Permit Numbers: 0320AOP1078 | 03-ED-50-16.4/16.8 | The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of Placerville | N/A, Placerville | 2 (04/19/2021) | Details CEM-3701 Report | |
215567 | Project ID: 215567 DEA: 081L3503 EFIS: 0820000060 COOP: 081712 | 08-SBD-83-2.4/2.9 | The project is a Caltrans widening along SR-83 in the City of Chino. The project proposes to construct right-turn lanes, a right in/right-out driveway, and a full access driveway leading to the proposed Euclid Commerce Center. | The project limits are along SR-83 between Kimball Avenue and Bickmore Avenue between PM 2.4 and PM 2.9 in the City of Chino. | 2 (03/05/2021) | Details CEM-3701 Report | |
215568 | Project ID: 215568 DEA: 044H4404 EFIS: 0413000251 | 04-CC-4-33.4/0 | The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width. | The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. | 2 (03/11/2021) | Details CEM-3701 Report |